Delivery
Project & completions managers
Live subsystem readiness, punch by category and owner, and a certificate log that shows what is blocking each gate.
For main contractors
As main contractor you are accountable for work you did not physically execute. Deskely gives every subcontractor a place to record evidence and gives you one derived view of what is actually signed — so the certificate you call is backed by records, not by a consolidated spreadsheet.
You are already delivering projects. Deskely removes the administrative layer that sits between finished work and accepted work — so the programme holds without a bigger completions team.
Completions engineers stop merging registers and re-keying subcontractor status. The consolidated view is produced by the records themselves, every time someone signs a sheet.
Mechanical completion, RFSU and handover are blocked while required ITRs are unsigned or category A punch is open. The milestone means the same thing to you and to the client.
Missing records, overdue preservation and rising punch are visible weeks before the walkdown, when a crew reallocation still costs days instead of a claim.
業界のリーダーから信頼されています




Control the register
Every ITR sits against a tag and a subsystem in the same register, whoever executes it. The consolidated view you report from is the register itself.
ストレーナー/フィルター
画像をご確認ください。
課題
A main contractor's exposure at handover comes from records held by other organisations, in other formats, on other timelines. The engineering is finished long before anyone can prove it.
Each package arrives in its own spreadsheet with its own tag naming and its own status column. Consolidation is a manual weekly job and the merged file is stale the moment it is issued.
Reported completion is what the subcontractor typed, not what the signed evidence shows. The gap only appears when the client asks for the sheet behind the percentage.
Deficiencies are raised by one party, cleared by another and verified by a third. Without a single list with categories and owners, category A items surface at the gate.
Chasing missing certificates, re-scanning illegible sheets and ordering thousands of documents pushes acceptance weeks past mechanical completion.
得られるもの
Subcontractors execute in their own scope. You see one consolidated, permission-controlled register where status is derived from the records beneath it.
A, B and C ITRs raised against tags, completed on tablet by whoever owns the package, signed by the right role and stored against the subsystem.
詳細を見る02One list across all packages, categorised A/B/C, assigned to the responsible organisation and gated against the milestone it blocks.
詳細を見る03Structured joint walks against a subsystem boundary, with punch raised on the spot instead of transcribed from a notebook afterwards.
詳細を見る04Recurring routines on installed-but-idle equipment, with overdue tasks visible before they turn into a warranty argument at acceptance.
詳細を見る05Mechanical completion, RFSU and handover certificates that cannot be issued while required records are missing or category A punch is open.
詳細を見る06One governed tag and subsystem hierarchy, with role-based permissions defining what each contractor can see, edit and sign.
詳細を見る動作方法
Each stage closes on evidence, so the next one starts from a record rather than a promise.
ステージ 01
Systems, subsystems, tags and disciplines are imported — or built from EPC documents with AI population — so every package works against the same hierarchy.
ステージ 02
Each organisation gets its own scope and sign-off roles. They see their work; you see everything.
ステージ 03
Crews complete checksheets offline on tablet, attach photo evidence and raise punch as they walk. Records sync when connectivity returns.
ステージ 04
Subsystem readiness is derived from signed records, so the certificate is issued against proof and the dossier is already assembled.
並べて表示
The difference is not the amount of work recorded. It is whether anyone can prove it on the day the client asks.
Spreadsheet consolidation
Register
One file per subcontractor, merged manually each week
進捗
Typed percentages that cannot be traced to a document
パンチ
Separate lists per package, categories applied inconsistently
証拠
Scans in dated folders, photos on personal phones
引き渡しドシエ
Assembled after mechanical completion, over weeks
Deskely
Register
One relational register every organisation writes to directly
進捗
Derived from signed ITRs, walkdowns and cleared punch
パンチ
One categorised list with owners and milestone gating
証拠
Attached to the record it proves, with a full audit trail
引き渡しドシエ
Compiled continuously and exportable per subsystem
The results
The scope does not change. What changes is how much effort sits between finished work and accepted work — and how early you can see a slip.
Weekly admin effort per completions engineer
Indicative of completions teams running multi-subcontractor scopes on Deskely. Model your own numbers in the ROI calculator.
Who it serves
Permissions decide what each organisation and role can see, edit and sign — no parallel copies, no re-typing between parties.

Delivery
Live subsystem readiness, punch by category and owner, and a certificate log that shows what is blocking each gate.

実行
Assigned checksheet lists on tablet, offline execution with photo evidence, and punch raised where the deficiency is found.

保証
Read-only traceability from certificate down to the signed record, so audits and client reviews need no document requests.
“Consolidating the subcontractor registers used to be a weekend job every week. Now the number on the dashboard is the number in the records, and the dossier builds itself as we sign.”
Completions manager — EPC contractor, LNG project
候補リストを作成する前に
タグ数と記録処理時間を入力して、管理時間とコストを確認してください。その後、ご自身の数値に基づいてデモを予約してください。
よくあるご質問
続きを読む
Calculators, checklists and module deep-dives to help you evaluate Deskely.
Put your tag count and record handling time in and see what the current process costs in admin hours.
詳細を見るA short assessment of how defensible your completions evidence is today, with the gaps ranked.
詳細を見るHow systems, subsystems, ITRs, punch and certificates fit together on a completions programme.
詳細を見るWhat your client sees when readiness is derived rather than reported.
詳細を見るHow the crews executing your packages record and close out work.
詳細を見るThe full execution model — ITRs, punch, walkdowns and certificates.