Raised where the problem is
A failed ITR check, a walkdown finding, a preservation cycle, or a rejected procedure step becomes a punch on the spot — with the tag, photo, and context already attached.
Punch Lists
Deskely turns deficiencies into tracked records: raised in the field with photo evidence, linked to the tag and the record that found them, assigned to a responsible party, and closed out with verification.
No credit card required · 14-day free trial
A failed ITR check, a walkdown finding, a preservation cycle, or a rejected procedure step becomes a punch on the spot — with the tag, photo, and context already attached.
Category, priority, responsible company, and due date are set when the item is created, so nothing lands in a list nobody is accountable for.
Open A items on a subsystem keep its certificate out of Ready for Issue. Close-out is enforced by the system rather than negotiated in a meeting.
Tag 01 · The Problem
Deficiencies are found everywhere — during an ITR, on a walkdown, in a preservation round, halfway through a commissioning procedure. They get written on a pad, photographed on a phone, and typed into a shared spreadsheet at the end of the shift, if at all.
By the time the list circulates, half the items have no tag, no category, and no responsible party. The photo that explained the problem is on a device belonging to someone who has rotated off. Two crews have raised the same item twice, and a third item was closed by someone with no record of what they actually fixed.
Close-out then becomes archaeology. Teams re-walk the plant to work out what is genuinely outstanding, contractors argue about whose scope an item belongs to, and the certificate waits on a number that changes every time the list is re-issued.
Tag 02 · How it works
A punch in Deskely is a record with a tag, a category, an owner, and a history — created once, in the field, and carried through to a closure someone put their name against.
Create the punch on tablet while standing at the equipment. Photograph the defect, describe it, and let the tag, system, and originating record attach themselves.
Set the category and priority against your project's convention — category A items block completion, lower categories are cleared before or after handover as agreed.
Give the item an owner, a responsible company, and a due date. It appears in that party's list immediately rather than in a weekly circulation.
The owner moves the item through its lifecycle, adds comments, and attaches the evidence of what was actually done — not just a status change.
Closure is verified against the evidence and attributed to the person who accepted it. The item stays linked to the ITR, walkdown, or procedure that raised it.
What is outstanding, who owns it, and what blocks completion is one number that does not change between reports.
Tag 03 · In the Field
The tablet app is offline-first, so a punch is created at the equipment with no connectivity required. The photograph is taken against the item itself, the description is written while the defect is in front of you, and the tag, system, and originating record attach automatically.
Category, priority, responsible company, and due date are set at creation, which is what makes the list usable later. There is no end-of-shift transcription step where context is lost, no photo stranded on a personal phone, and no ambiguity about which tag an item belongs to.
On sync, the item appears in its owner's list, contributes to close-out status by system and discipline, and — if it is a category A item — is immediately visible as something holding a certificate. Progress and closure are recorded on the same record, with comments and verification evidence attached.
Tag 04 · Assurance
Punch close-out decides when a system can be certified, so it has to be evidenced rather than asserted. The rules below hold on every item, regardless of who raised it or how close the handover date is.
Every punch is bound to a tag and to the record that raised it — an ITR, a walkdown, a preservation cycle, or a commissioning procedure
Category and responsible party are set at creation, so no item enters the register without an owner
Photographs are attached to the item they evidence, both when it is raised and when it is closed
Status changes, comments, and closures are attributed with the user, date, and time
Open category A items keep the affected certificate out of Ready for Issue automatically
Filtered registers export to Excel or PDF, so contractors and clients work the same list you do
When a client asks what happened to an item raised three months ago, the answer is the item itself: where it was found, what it looked like, who accepted it, what was done, and who verified the fix — with the certificate it was holding released on the same record.
Tag 05 · Business Outcomes
Responsible company and owner are recorded when the item is raised, so close-out meetings work the list instead of arguing about whose scope it is.
Outstanding items by system, discipline, and category are live, so you can see what genuinely stands between the project and its next certificate.
Photographs and context are captured at discovery and at closure, so nobody walks the plant again just to confirm whether an item is still open.
Category A items are cleared before certification by design, and the remaining items hand over as a documented, owned list rather than a surprise.
FAQ
Related Modules
Build templates with sections and steps, issue checksheets, and execute on tablet with evidence capture.
Run area-based verification walkdowns with integrated field discovery and punch creation.
Monitor project readiness and track prerequisites based on G-series certificate standards.