For owners and operators

    You are paying for an asset. See what is actually finished.

    Owners are usually told how complete a project is rather than shown. Deskely gives you a read-only view of the same records your contractor executes against, so readiness, punch and certificate status come from signed evidence instead of a status meeting.

    ライブ
    Readiness instead of weekly reporting
    0
    Document requests to verify a status
    A/B/C
    Punch visible by category and owner
    準備完了
    Dossier complete at acceptance

    Accept the asset on evidence, not on assurance.

    You pay for the asset and you live with it for thirty years. Deskely gives you an independent, read-only view of what has actually been proven — during construction, not at the handover meeting.

    See readiness as it is built

    Subsystem progress derived from signed records, refreshed as the field works. No weekly slide, no reconciliation call to understand a percentage.

    Intervene while it is still cheap

    Rising category A punch, overdue preservation and missing test records are visible months before the acceptance date, when the contractor can still recover them.

    Own the dossier from day one

    The handover pack is assembled continuously and indexed to your tag hierarchy, so it transfers straight into operations and maintenance instead of into a review backlog.

    業界のリーダーから信頼されています

    ExxonMobilMODECEquinorStraits Bio LNGCompass Energy

    See what has actually been proven on your asset.

    Independent view

    Readiness you can read without a status pack.

    Owner access is read-only and always current — derived from the contractor's signed records rather than from a weekly slide.

    • Progress by system, subsystem and discipline
    • Comparable definitions of complete across contractors
    • Punch and preservation exposure in one place
    • No reconciliation call needed to understand a number
    Deskely
    船体 482 — 完了
    タグ、ITRなどを検索…⌘K
    OA
    ホーム/プロジェクトインテリジェンス

    プロジェクトインテリジェンス

    プロジェクトの分析とリスク概要

    たった今更新しました
    エクスポートを生成
    概要ボトルネックレディネス手直し責任トレンドスケジュール資産作業員

    プロジェクト健全性スナップショット

    プロジェクトヘルススコア

    25クリティカル

    ブロックされた証明書

    92
    先週比92

    現在、証明書を進めることができません。

    致命的なブロッカー

    0
    先週比 0

    アクティブな作業全体における重大度の高いブロッカー。

    クリティカルなパンチ

    4
    先週比4件

    対応が必要なオープンな重要パンチ項目。

    承認バックログ

    2
    先週と比較して2件

    サインオフ保留中。最も古い項目は54日前です。

    レディネススコア

    5%

    依存関係が満たされた証明書。

    手直しイベント

    0先週比 0

    現在、再作業または却下状態にある項目。

    期限超過のPWL

    14先週比 14件

    期日を過ぎた保全(プリザベーション)作業リスト。

    リスクのあるシステム

    0

    却下されたITRまたはブロッカーの圧力を受けているシステム。

    プロジェクトが停止する理由

    プロジェクト全体における最大の遅延原因。

    進行停止中9
    承認待ち2

    ブロックされている上位証明書

    すべて表示

    現在のブロッカー数に基づく最も緊急性の高い証明書。

    1. UAC

    システム未提供

    80

    ブロッカー

    2. SHC-82

    システム未提供

    24

    ブロッカー

    3. SHC-13

    システム未提供

    22

    ブロッカー

    課題

    Reported progress and proven progress are not the same number.

    By the time the difference is visible, the acceptance date is already at risk and the leverage to fix it is gone.

    • 01

      Progress arrives as a slide

      A weekly percentage with no way to open the record beneath it. You cannot tell whether a subsystem is 90% done or 90% claimed.

    • 02

      Punch surfaces late

      Category A deficiencies that block acceptance appear at the gate rather than while there is still time and contractor presence to clear them.

    • 03

      The dossier is a black box

      You find out what is missing when you start reviewing it — after mechanical completion, with the commissioning team demobilising.

    • 04

      No comparable view across projects

      Each contractor reports in their own format, so portfolio-level readiness has to be rebuilt by hand every reporting cycle.

    動作方法

    From construction reporting to signed acceptance.

    Each stage closes on evidence, so the next one starts from a record rather than a promise.

    1. ステージ 01

      Get an owner account

      Read-only access to the contractor's live project, scoped to the systems and disciplines you are responsible for.

    2. ステージ 02

      Watch readiness build

      Completion moves as records are signed, so trend and forecast are based on the same data the field produces.

    3. ステージ 03

      Intervene while it is cheap

      Track category A punch and missing records weeks before the gate, while the crews who can clear them are still mobilised.

    4. ステージ 04

      Accept against evidence

      Issue acceptance with the dossier already compiled per subsystem — every certificate traceable to the records that support it.

    並べて表示

    Contractor reporting versus owner visibility.

    Both describe the same project. Only one of them can be opened and checked.

    Weekly reporting pack

    • Completion figure

      Manually entered, reported after the fact

    • 検証

      Request the sheet, wait for the scan

    • Punch visibility

      Summary counts by contractor

    • 引き渡しドシエ

      Delivered at the end, reviewed under time pressure

    • Across projects

      Different formats, rebuilt each cycle

    Deskely owner view

    • Completion figure

      Derived live from signed records

    • 検証

      Open the record from the dashboard

    • Punch visibility

      Every item with category, owner, photo and blocked milestone

    • 引き渡しドシエ

      Visible and complete throughout the project

    • Across projects

      One comparable readiness model

    Who it serves

    Built for the people who sign the acceptance.

    Owner access is read-only by default and scoped by project, so your teams get transparency without touching the contractor's execution.

    Portfolio

    Project directors & sponsors

    Comparable readiness across projects, with the same definition of complete applied to every contractor on every site.

    技術

    Owner's engineers & inspectors

    Drill from a certificate to the signed ITR, the punch history and the photo evidence behind it in a few clicks.

    Operations

    Operations & maintenance teams

    Preservation history, as-built records and the final dossier arrive structured against the asset register you will run.

    We stopped asking for status packs. We open the project, look at what is signed, and the conversation with the contractor starts from the same facts.

    Project directorAsset owner, power sector

    候補リストを作成する前に

    現在のプロセスにかかるコストを見積もる

    タグ数と記録処理時間を入力して、管理時間とコストを確認してください。その後、ご自身の数値に基づいてデモを予約してください。

    ROI計算ツールを開く

    よくあるご質問

    Questions from owners.

    デジタル化準備完了
    コミッショニングおよび
    引き渡しですか?

    お客様の体験を向上させるため、クッキーを使用しています。
    一部のCookieをオプトアウトできます。
    詳細についてはこちら プライバシーポリシー.