For owners and operators
You are paying for an asset. See what is actually finished.
Owners are usually told how complete a project is rather than shown. Deskely gives you a read-only view of the same records your contractor executes against, so readiness, punch and certificate status come from signed evidence instead of a status meeting.
- ライブ
- Readiness instead of weekly reporting
- 0
- Document requests to verify a status
- A/B/C
- Punch visible by category and owner
- 準備完了
- Dossier complete at acceptance
Accept the asset on evidence, not on assurance.
You pay for the asset and you live with it for thirty years. Deskely gives you an independent, read-only view of what has actually been proven — during construction, not at the handover meeting.
See readiness as it is built
Subsystem progress derived from signed records, refreshed as the field works. No weekly slide, no reconciliation call to understand a percentage.
Intervene while it is still cheap
Rising category A punch, overdue preservation and missing test records are visible months before the acceptance date, when the contractor can still recover them.
Own the dossier from day one
The handover pack is assembled continuously and indexed to your tag hierarchy, so it transfers straight into operations and maintenance instead of into a review backlog.
業界のリーダーから信頼されています




See what has actually been proven on your asset.
Independent view
Readiness you can read without a status pack.
Owner access is read-only and always current — derived from the contractor's signed records rather than from a weekly slide.
- Progress by system, subsystem and discipline
- Comparable definitions of complete across contractors
- Punch and preservation exposure in one place
- No reconciliation call needed to understand a number
プロジェクトインテリジェンス
プロジェクトの分析とリスク概要
プロジェクト健全性スナップショット
プロジェクトヘルススコア
ブロックされた証明書
現在、証明書を進めることができません。
致命的なブロッカー
アクティブな作業全体における重大度の高いブロッカー。
クリティカルなパンチ
対応が必要なオープンな重要パンチ項目。
承認バックログ
サインオフ保留中。最も古い項目は54日前です。
レディネススコア
依存関係が満たされた証明書。
手直しイベント
現在、再作業または却下状態にある項目。
期限超過のPWL
期日を過ぎた保全(プリザベーション)作業リスト。
リスクのあるシステム
却下されたITRまたはブロッカーの圧力を受けているシステム。
プロジェクトが停止する理由
プロジェクト全体における最大の遅延原因。
ブロックされている上位証明書
すべて表示現在のブロッカー数に基づく最も緊急性の高い証明書。
1. UAC
システム未提供
80
ブロッカー
2. SHC-82
システム未提供
24
ブロッカー
3. SHC-13
システム未提供
22
ブロッカー
課題
Reported progress and proven progress are not the same number.
By the time the difference is visible, the acceptance date is already at risk and the leverage to fix it is gone.
- 01
Progress arrives as a slide
A weekly percentage with no way to open the record beneath it. You cannot tell whether a subsystem is 90% done or 90% claimed.
- 02
Punch surfaces late
Category A deficiencies that block acceptance appear at the gate rather than while there is still time and contractor presence to clear them.
- 03
The dossier is a black box
You find out what is missing when you start reviewing it — after mechanical completion, with the commissioning team demobilising.
- 04
No comparable view across projects
Each contractor reports in their own format, so portfolio-level readiness has to be rebuilt by hand every reporting cycle.
得られるもの
Independent visibility, without touching execution.
You get the owner's view of the live record: what is signed, what is open, and what the certificate depends on — with no ability to alter contractor data.
Derived progress dashboards
Subsystem and system completion calculated from signed ITRs, completed walkdowns and cleared punch — never a typed percentage.
詳細を見る02Certificate readiness
See exactly which records and which punch items stand between a subsystem and its mechanical completion or RFSU certificate.
詳細を見る03Punch by category and owner
Open A, B and C items with photos, responsible organisation and the milestone each one blocks.
詳細を見る04Evidence traceability
Open any status and read the signed record behind it, including who signed, when, and the photos attached at the time.
詳細を見る05Preservation compliance
Confirm that equipment installed months before start-up was actually preserved, before it becomes a warranty dispute.
詳細を見る06Role-based owner access
Read-only accounts for your project, operations and assurance teams, scoped by project and discipline.
詳細を見るEight modules, one project record.
プラットフォームを見る動作方法
From construction reporting to signed acceptance.
Each stage closes on evidence, so the next one starts from a record rather than a promise.
ステージ 01
Get an owner account
Read-only access to the contractor's live project, scoped to the systems and disciplines you are responsible for.
ステージ 02
Watch readiness build
Completion moves as records are signed, so trend and forecast are based on the same data the field produces.
ステージ 03
Intervene while it is cheap
Track category A punch and missing records weeks before the gate, while the crews who can clear them are still mobilised.
ステージ 04
Accept against evidence
Issue acceptance with the dossier already compiled per subsystem — every certificate traceable to the records that support it.
並べて表示
Contractor reporting versus owner visibility.
Both describe the same project. Only one of them can be opened and checked.
Weekly reporting pack
Completion figure
Manually entered, reported after the fact
検証
Request the sheet, wait for the scan
Punch visibility
Summary counts by contractor
引き渡しドシエ
Delivered at the end, reviewed under time pressure
Across projects
Different formats, rebuilt each cycle
Deskely owner view
Completion figure
Derived live from signed records
検証
Open the record from the dashboard
Punch visibility
Every item with category, owner, photo and blocked milestone
引き渡しドシエ
Visible and complete throughout the project
Across projects
One comparable readiness model
Who it serves
Built for the people who sign the acceptance.
Owner access is read-only by default and scoped by project, so your teams get transparency without touching the contractor's execution.
Portfolio
Project directors & sponsors
Comparable readiness across projects, with the same definition of complete applied to every contractor on every site.
技術
Owner's engineers & inspectors
Drill from a certificate to the signed ITR, the punch history and the photo evidence behind it in a few clicks.
Operations
Operations & maintenance teams
Preservation history, as-built records and the final dossier arrive structured against the asset register you will run.
“We stopped asking for status packs. We open the project, look at what is signed, and the conversation with the contractor starts from the same facts.”
Project director — Asset owner, power sector
候補リストを作成する前に
現在のプロセスにかかるコストを見積もる
タグ数と記録処理時間を入力して、管理時間とコストを確認してください。その後、ご自身の数値に基づいてデモを予約してください。
よくあるご質問
Questions from owners.
続きを読む
Tools and guides for owners.
Calculators, checklists and module deep-dives to help you evaluate Deskely.
引き渡し準備状況チェック
Score how much of your acceptance criteria is currently backed by traceable evidence.
詳細を見る証明書とゲート
How mechanical completion, RFSU and handover certificates are gated against records and punch.
詳細を見るIndustries we serve
Sector and project-type detail, from LNG and FPSO to power, water, data centres and life sciences.
詳細を見るMain contractors
How your contractor consolidates every package into the record you review.
詳細を見る証明書
How mechanical completion, RFSU and handover certificates are gated on evidence.
詳細を見る産業
Completions models by sector and project type.
詳細を見る