Master Data

    Every report is only as good as the list behind it.

    Master data is the set of controlled reference lists that Deskely uses everywhere — disciplines, tag types, areas, systems, companies. Get it right at project setup and scoping, filtering and progress reporting stay reliable for the life of the project.

    No credit card required · 14-day free trial

    PROJECT CATALOGUE · SUBSYSTEM 2100-01DISCIPLINESTAG TYPESAREASCOMPANIESRod in — the list is closed to free textAUTHORITY RECORDMD-DISC-001MECMechanicalPREFERRED TERMUSE FORMechMECH.Mechanical (typed)mecFiled by project setup lead · 04 FebSEE ALSO — WHERE THESE CODES ARE USEDTag register1,284 tagsbuilt from the same codesTemplates54 scopedITR, preservation, proceduresFilters & reportsone spellingtotals that reconcileCertificatesrolls upreadiness by discipline
    One list

    Codes defined in a single place

    Disciplines, tag types, areas, systems, companies and roles live as controlled reference lists rather than as free text typed differently by each team.

    Everywhere

    Consumed by every module

    Tags, templates, scoping rules, filters, dashboards and certificates all read the same values, so what you select in one place means the same thing in the next.

    Governed

    Changed by people who should

    Managing master data is a permission. Edits and deletes are treated as controlled actions because they reach every record that references the value.

    The problem

    Five spellings of one discipline is five different projects.

    Reference data usually starts as free text. One engineer types MEC, another types Mechanical, a third imports a vendor list that says MECH. Nobody notices, because each entry looks correct on the record it was typed into.

    It surfaces later, and always at the worst moment. A template scoped to a discipline applies to a third of the tags it should. A filter for an area returns a clean list that quietly excludes two hundred items. A weekly progress figure moves because someone corrected a spelling, not because any work was done.

    Fixing it late means touching tags, templates and issued records at once, on a live project, while people are still using them. The cost is not the typing — it is the week spent reconciling numbers nobody trusts and the credibility lost with the client in the meantime.

    FILED FIVE TIMES · NO PREFERRED TERMMECDisciplineFiled byEPC importTags318NO CROSS-REFERENCEMechDisciplineFiled bytyped on siteTags204NO CROSS-REFERENCEMECH.DisciplineFiled byvendor listTags96NO CROSS-REFERENCEMechanicalDisciplineFiled bytyped in officeTags61NO CROSS-REFERENCEmecDisciplineFiled bytyped on siteTags12NO CROSS-REFERENCERod withdrawn — anything can be filed, so everything is
    How it works

    Set up once at the start, relied on for the whole project.

    Master data is a short piece of work at project setup that quietly determines whether every filter, template and progress report behaves for the next two years.

    CARD

    Agree the categories

    Decide which lists the project runs on — disciplines, tag types, areas, systems, companies, roles — before the first tag is created.

    CARD

    Set the unique codes

    Each entry gets a unique code and a description. The code is what the system reasons with; the description is what people read in dropdowns and reports.

    CARD

    Build the tag register on it

    Tags select from the lists rather than accepting free text, so the register is consistent from the first import onwards — including when AI Population creates it from EPC documents.

    CARD

    Scope templates by the same values

    ITR, preservation and procedure templates apply to tag types and disciplines, so scoping rules match the register exactly instead of approximately.

    CARD

    Maintain it as a controlled change

    Editing or removing a value reaches every record that references it, so changes are made deliberately by someone with the permission to make them.

    RESULT

    One vocabulary, end to end

    A discipline means the same thing in a template, a filter, a dashboard and a certificate — because there is only one of it.

    Project control

    Values are picked from a list, never typed into a box.

    Anywhere a discipline, tag type, area, system or company is needed, Deskely presents the project's controlled list. There is no free-text alternative to fall back on, which is what keeps the register clean without anyone policing it.

    Because the same codes run through the whole platform, a filter behaves the way you expect it to. Scope an ITR template to a tag type and it applies to every tag of that type. Filter the punch register by discipline and you get all of it, not the portion that happened to be spelled your way.

    Before changing an entry, you can see what depends on it — how many tags, templates and open records reference the value — so maintenance on a live project is a considered decision rather than a discovery made a week later in a progress meeting.

    MD·A — DRAWN, NOT TYPEDMECMechanicalIN USEThere is no free-text card to fileMD·B — THE REVERSE OF THE CARDREFERENCED BYTags1,284ITR templates36PWL templates18Open punches94Seen before the edit, not a week after itMD·C — TALLIESMECELEINSOne count per code

    Start with a 14-day
    free trial of Pro.

    Assurance

    Reference data is infrastructure, so it is treated like infrastructure.

    A single careless edit to a shared list can move every number on the project. These rules hold on every entry, on every project, from setup through handover.

    Managing master data is a role permission — users without it can select values but cannot change the lists

    Every entry carries a unique code and a description, so the machine-readable key stays stable when wording changes

    Values are selected from controlled lists wherever they are used, so free-text near-duplicates never enter the register

    Usage is visible before an edit: how many tags, templates and open records reference the value

    Changes to reference data are attributed to a user with a date and time

    The same codes flow into tags, templates, punches, certificates and exports, so external reports match the system

    MD·D — THE CARD CANNOT LEAVE THE DRAWERMECMechanicalDELETE REQUESTED18 Mar · system admin1,284 tags36 ITR templates18 PWL templates94 open punchesHeld — references keep the record intactMD·E — AMENDMENT SLIP04 FebProject setup leadCreated MEC — Mechanical11 FebCommissioning mgrAdded tag type Transmitter02 MarProject setup leadReworded area 2100 · code kept18 MarSystem adminDelete refused · still referencedEvery amendment carries a date and a name

    When a progress figure is challenged, the discussion is about the work, not about whether two spellings of the same discipline have been counted twice.

    Business outcomes

    What this changes for your project.

    Progress numbers that hold up

    Totals by discipline, area and system are complete by construction, so the weekly report does not move because someone corrected a spelling.

    Filters you can rely on

    A filtered list is the whole list. Scoping, issuing and close-out all work against the same values, so nothing is quietly excluded.

    Faster project setup

    With the lists agreed first, the tag register, templates and scoping rules fall into place instead of being reworked once inconsistencies surface.

    No late data clean-up

    The reconciliation exercise that usually lands weeks before handover simply does not happen, because duplicates were never able to enter.

    FAQ

    Frequently asked questions.

    Ready to digitize
    commissioning and
    handover?

    We use cookies to improve your experience.
    You can opt out of certain cookies.
    Find out more in our privacy policy.