For subcontractors

    Do the work once, and get signed off for it.

    Most disputes on a package are not about the work — they are about whether the record proving it is complete, legible and in the right place. Deskely gives crews an offline tablet app where the evidence is captured as the job is done, so sign-off is not a second job back in the office.

    Offline
    Full execution with no connectivity
    1x
    Record entered once, not three times
    Fewer
    Sheets returned for missing fields
    Faster
    Sign-off on completed scope

    Do the work once, get signed off sooner.

    Your margin depends on how fast completed scope turns into an accepted record. Deskely removes the paper round-trip between the field and the client's completions team.

    Record it where you did it

    Checksheets are completed on tablet at the equipment, offline, with photos attached. No evening transcription, no second entry into someone else's spreadsheet.

    Fewer rejected sheets

    Required fields, signatures and evidence are validated before submission, so records are not returned weeks later for a missing value.

    Invoice against proof

    Signed records are timestamped and attributable, so completed scope is visible to the client immediately and sign-off stops being a negotiation.

    Trusted by industry leaders

    ExxonMobilMODECEquinorStraits Bio LNGCompass Energy

    See how a crew records, submits and gets signed off.

    Work offline

    Complete the checksheet at the equipment, not at the office.

    Assigned records open on a tablet or phone, work without signal, and sync the moment you are back in coverage.

    • Today's assigned scope in one list
    • Photo evidence attached at the tag
    • Signatures captured in the field
    • Offline execution with automatic sync
    deskely
    Hull 482 — Completions
    Search tags, ITRs…⌘K
    OA
    FavouritesDefaultNew
    Header Text
    Button Group
    Single line text
    Text field with labels
    Radio Button
    Checkboxes
    Table
    Text Box
    Date Picker
    Image
    ITR Templates/M-02A/Design Template

    M-02A

    Strainers / Filters

    Preview
    1. Inspection checklist:
    1. Vendor inspection and test completed. *
    YesNoNA
    2. Confirm nameplate is installed and correct to design specification. *
    YesNoNA
    Manufacturer
    Type / Model no.
    Serial no.
    Data sheet no.
    3. Confirm specifications

    Please review image.

    DN80
    Go Back
    Save as DraftSave & Publish

    The problem

    The paperwork costs more than the scope.

    Crews finish the physical work on time and then lose days to transcription, rework and chasing a signature.

    • 01

      Paper first, system second

      Checksheets are filled in on site, carried back, typed into someone's spreadsheet and scanned. Every step is a chance to lose or garble the record.

    • 02

      Rejected sheets come back weeks later

      A missing field or an unreadable signature is found long after demobilisation, so someone returns to site to redo a check that was actually performed.

    • 03

      No proof of what was found

      Photos live on personal phones, detached from the tag they relate to. When the client disputes a condition there is nothing to show.

    • 04

      Sign-off delays payment

      Milestones cannot be invoiced until the records behind them are accepted, so slow paperwork directly slows cash.

    How it runs

    A working day on a Deskely package.

    Each stage closes on evidence, so the next one starts from a record rather than a promise.

    1. Stage 01

      Pick up your list

      Assigned ITRs, punch and preservation tasks for the day sync to the tablet before you leave the office or the module.

    2. Stage 02

      Work offline

      Complete checks, record readings, attach photos and raise punch with no network. Everything is stored locally.

    3. Stage 03

      Sync and submit

      Records upload automatically when connectivity returns, already validated and attached to the correct tag and subsystem.

    4. Stage 04

      Get signed

      The reviewing role signs in the system. Your completed scope becomes visible progress on the main contractor's register immediately.

    Side by side

    Paper checksheets versus tablet execution.

    Same inspection. Very different cost of proving it happened.

    Paper and scans

    • Capture

      Written on site, typed up later, then scanned

    • Connectivity

      Not needed — but nothing is visible until it is typed

    • Rejections

      Found weeks later, often after demobilisation

    • Photos

      On personal phones, unlinked to the tag

    • Sign-off

      Chased by email and site visit

    Deskely

    • Capture

      Recorded once on tablet at the point of work

    • Connectivity

      Works fully offline and syncs automatically

    • Rejections

      Required fields validated before submission

    • Photos

      Attached to the record with author and timestamp

    • Sign-off

      Routed to the responsible role in the system

    Who it serves

    Fits how a subcontract crew actually works.

    You see only your assigned scope. Setup is an account and a device — no server, no licence negotiation, no IT project.

    Field

    Technicians & foremen

    A clear list of what to complete today, executed offline on a tablet or phone and synced when signal returns.

    Supervision

    Site supervisors & QC

    Review, sign and release your package, with visibility of every punch item raised against your scope.

    Commercial

    Contract & QS teams

    An auditable trail of what was completed and when, ready to support progress claims and variation discussions.

    We used to lose two days a week re-typing checksheets and arguing about what had been done. Now the sheet is signed at the valve and the client can see it the same shift.

    Site supervisorMechanical subcontractor

    Before you shortlist

    Estimate what your current process costs

    Enter your tag count and record handling time to see the admin hours and cost in play — then book a demo against your own numbers.

    Open the ROI calculator

    FAQ

    Questions from subcontractors.