For main contractors

    You carry the handover date. Deskely makes it defensible.

    As main contractor you are accountable for work you did not physically execute. Deskely gives every subcontractor a place to record evidence and gives you one derived view of what is actually signed — so the certificate you call is backed by records, not by a consolidated spreadsheet.

    FOUR CREWS · ONE STRANDMECH · Alpha148/160E&I · Delta96/132PIPE · Nord210/224HVAC · Vex41/7883%SUBSYSTEM READINESS495 SIGNED RECORDSGATE HELD3 category A punch openNo consolidation step · the instrument reads the register, and the register is the record
    1
    Consolidated register across all packages
    0
    Manual weekly merges
    100%
    Progress traceable to a signed record
    Day 1
    Dossier ready at mechanical completion

    Deliver the same scope with less exposure.

    You are already delivering projects. Deskely removes the administrative layer that sits between finished work and accepted work — so the programme holds without a bigger completions team.

    Free your engineers from chasing

    Completions engineers stop merging registers and re-keying subcontractor status. The consolidated view is produced by the records themselves, every time someone signs a sheet.

    Run the gate on evidence

    Mechanical completion, RFSU and handover are blocked while required ITRs are unsigned or category A punch is open. The milestone means the same thing to you and to the client.

    Protect the schedule float

    Missing records, overdue preservation and rising punch are visible weeks before the walkdown, when a crew reallocation still costs days instead of a claim.

    Trusted by industry leaders

    ExxonMobilMODECEquinorStraits Bio LNGCompass Energy

    See everything you need to hold the handover date.

    Control the register

    One live checksheet register across every subcontractor.

    Every ITR sits against a tag and a subsystem in the same register, whoever executes it. The consolidated view you report from is the register itself.

    • One tag hierarchy for all packages, no per-sub spreadsheets
    • Progress derived from signed records, not typed percentages
    • Assignment and re-assignment without re-issuing files
    • Every signature attributable, timestamped and auditable
    deskely
    Hull 482 — Completions
    Search tags, ITRs…⌘K
    OA
    FavouritesDefaultNew
    Header Text
    Button Group
    Single line text
    Text field with labels
    Radio Button
    Checkboxes
    Table
    Text Box
    Date Picker
    Image
    ITR Templates/M-02A/Design Template

    M-02A

    Strainers / Filters

    Preview
    1. Inspection checklist:
    1. Vendor inspection and test completed. *
    YesNoNA
    2. Confirm nameplate is installed and correct to design specification. *
    YesNoNA
    Manufacturer
    Type / Model no.
    Serial no.
    Data sheet no.
    3. Confirm specifications

    Please review image.

    DN80
    Go Back
    Save as DraftSave & Publish

    The problem

    The risk is not the work. It is proving the work.

    A main contractor's exposure at handover comes from records held by other organisations, in other formats, on other timelines. The engineering is finished long before anyone can prove it.

    • 01

      One register per subcontractor

      Each package arrives in its own spreadsheet with its own tag naming and its own status column. Consolidation is a manual weekly job and the merged file is stale the moment it is issued.

    • 02

      Progress you cannot audit

      Reported completion is what the subcontractor typed, not what the signed evidence shows. The gap only appears when the client asks for the sheet behind the percentage.

    • 03

      Punch owned by nobody

      Deficiencies are raised by one party, cleared by another and verified by a third. Without a single list with categories and owners, category A items surface at the gate.

    • 04

      The dossier becomes a second project

      Chasing missing certificates, re-scanning illegible sheets and ordering thousands of documents pushes acceptance weeks past mechanical completion.

    ONE REGISTER · THREE ANSWERS BY FRIDAY70%75%80%85%MONTUEWEDTHUFRISame 1,240records onMonday morning82%REGISTER_MECH_v7owner · Alpha79%MASTER_consolidatedowner · Completions74%register-final-2owner · Delta8 points of spread · reconciled by hand in 6–8 hrs, every week, before the client call

    How it runs

    From award to accepted handover.

    Each stage closes on evidence, so the next one starts from a record rather than a promise.

    1. Stage 01

      Load the scope once

      Systems, subsystems, tags and disciplines are imported — or built from EPC documents with AI population — so every package works against the same hierarchy.

    2. Stage 02

      Assign packages to subcontractors

      Each organisation gets its own scope and sign-off roles. They see their work; you see everything.

    3. Stage 03

      Execute in the field

      Crews complete checksheets offline on tablet, attach photo evidence and raise punch as they walk. Records sync when connectivity returns.

    4. Stage 04

      Call the gate on evidence

      Subsystem readiness is derived from signed records, so the certificate is issued against proof and the dossier is already assembled.

    Side by side

    Consolidated spreadsheets versus one live record.

    The difference is not the amount of work recorded. It is whether anyone can prove it on the day the client asks.

    Spreadsheet consolidation

    • Register

      One file per subcontractor, merged manually each week

    • Progress

      Typed percentages that cannot be traced to a document

    • Punch

      Separate lists per package, categories applied inconsistently

    • Evidence

      Scans in dated folders, photos on personal phones

    • Handover dossier

      Assembled after mechanical completion, over weeks

    Deskely

    • Register

      One relational register every organisation writes to directly

    • Progress

      Derived from signed ITRs, walkdowns and cleared punch

    • Punch

      One categorised list with owners and milestone gating

    • Evidence

      Attached to the record it proves, with a full audit trail

    • Handover dossier

      Compiled continuously and exportable per subsystem

    FIVE KEYS · CERTIFICATE MC-2140 · SUBSYSTEM 21-40ITR-ALoop checks160 signedITR-BFunctional test82 signedPreservation cycles0 overdueClient witnessingscheduled 14:00Category A punch3 open · Alpha4 OF 5 TURNED — THE LOCK ONLY OPENS ON EVIDENCEMechanical completionNOT READYFOR ISSUEHeld by · Alpha MechanicalDossier compiles on releaseThe milestone cannot be called before the evidence exists — so it means the same to you and to the client

    The results

    Ditch the weekend consolidation.

    The scope does not change. What changes is how much effort sits between finished work and accepted work — and how early you can see a slip.

    Weekly admin effort per completions engineer

    hrsSpreadsheetsDeskely
    01
    6–8 hrs
    Weekly register consolidation removed per completions engineer
    02
    100%
    Reported progress traceable to a signed record
    03
    Day 0
    Dossier ready at mechanical completion, not weeks after

    Indicative of completions teams running multi-subcontractor scopes on Deskely. Model your own numbers in the ROI calculator.

    Who it serves

    Everyone on the project works from one record.

    Permissions decide what each organisation and role can see, edit and sign — no parallel copies, no re-typing between parties.

    Completions manager reviewing subsystem readiness on site

    Delivery

    Project & completions managers

    Live subsystem readiness, punch by category and owner, and a certificate log that shows what is blocking each gate.

    Field technician completing a checksheet on a tablet

    Execution

    Discipline leads & subcontractors

    Assigned checksheet lists on tablet, offline execution with photo evidence, and punch raised where the deficiency is found.

    QA engineer reviewing signed records in a project office

    Assurance

    QA/QC and the client team

    Read-only traceability from certificate down to the signed record, so audits and client reviews need no document requests.

    Consolidating the subcontractor registers used to be a weekend job every week. Now the number on the dashboard is the number in the records, and the dossier builds itself as we sign.

    Completions managerEPC contractor, LNG project

    Before you shortlist

    Estimate what your current process costs

    Enter your tag count and record handling time to see the admin hours and cost in play — then book a demo against your own numbers.

    Open the ROI calculator

    FAQ

    Questions from main contractors.