For owners and operators

    You are paying for an asset. See what is actually finished.

    Owners are usually told how complete a project is rather than shown. Deskely gives you a read-only view of the same records your contractor executes against, so readiness, punch and certificate status come from signed evidence instead of a status meeting.

    Live
    Readiness instead of weekly reporting
    0
    Document requests to verify a status
    A/B/C
    Punch visible by category and owner
    Ready
    Dossier complete at acceptance

    Accept the asset on evidence, not on assurance.

    You pay for the asset and you live with it for thirty years. Deskely gives you an independent, read-only view of what has actually been proven — during construction, not at the handover meeting.

    See readiness as it is built

    Subsystem progress derived from signed records, refreshed as the field works. No weekly slide, no reconciliation call to understand a percentage.

    Intervene while it is still cheap

    Rising category A punch, overdue preservation and missing test records are visible months before the acceptance date, when the contractor can still recover them.

    Own the dossier from day one

    The handover pack is assembled continuously and indexed to your tag hierarchy, so it transfers straight into operations and maintenance instead of into a review backlog.

    Trusted by industry leaders

    ExxonMobilMODECEquinorStraits Bio LNGCompass Energy

    See what has actually been proven on your asset.

    Independent view

    Readiness you can read without a status pack.

    Owner access is read-only and always current — derived from the contractor's signed records rather than from a weekly slide.

    • Progress by system, subsystem and discipline
    • Comparable definitions of complete across contractors
    • Punch and preservation exposure in one place
    • No reconciliation call needed to understand a number
    deskely
    Hull 482 — Completions
    Search tags, ITRs…⌘K
    OA
    Home/Project Intelligence

    Project Intelligence

    Analytics and risk overview for your project

    Updated just now
    Generate Export
    OverviewBottlenecksReadinessReworkResponsibilityTrendsScheduleAssetsWorkforce

    Project Health Snapshot

    Project Health Score

    25Critical

    Blocked Certs

    92
    92 vs last week

    Certificates currently unable to move forward.

    Critical Blockers

    0
    0 vs last week

    High-severity blockers across active work.

    Critical Punches

    4
    4 vs last week

    Open critical punch items needing attention.

    Approval Backlog

    2
    2 vs last week

    Pending sign-offs. Oldest item is 54 days old.

    Readiness Score

    5%

    Certificates with dependencies met.

    Rework Events

    00 vs last week

    Items currently in a rework or rejection state.

    Overdue PWLs

    1414 vs last week

    Preservation work lists past their due date.

    Systems at Risk

    0

    Systems carrying rejected ITR or blocker pressure.

    Why The Project Is Blocked

    Largest active sources of delay across the project.

    Stalled in Progress9
    Awaiting Sign-Off2

    Top Blocked Certificates

    View all

    Highest-pressure certificates based on current blocker count.

    1. UAC

    System not provided

    80

    blockers

    2. SHC-82

    System not provided

    24

    blockers

    3. SHC-13

    System not provided

    22

    blockers

    The problem

    Reported progress and proven progress are not the same number.

    By the time the difference is visible, the acceptance date is already at risk and the leverage to fix it is gone.

    • 01

      Progress arrives as a slide

      A weekly percentage with no way to open the record beneath it. You cannot tell whether a subsystem is 90% done or 90% claimed.

    • 02

      Punch surfaces late

      Category A deficiencies that block acceptance appear at the gate rather than while there is still time and contractor presence to clear them.

    • 03

      The dossier is a black box

      You find out what is missing when you start reviewing it — after mechanical completion, with the commissioning team demobilising.

    • 04

      No comparable view across projects

      Each contractor reports in their own format, so portfolio-level readiness has to be rebuilt by hand every reporting cycle.

    How it runs

    From construction reporting to signed acceptance.

    Each stage closes on evidence, so the next one starts from a record rather than a promise.

    1. Stage 01

      Get an owner account

      Read-only access to the contractor's live project, scoped to the systems and disciplines you are responsible for.

    2. Stage 02

      Watch readiness build

      Completion moves as records are signed, so trend and forecast are based on the same data the field produces.

    3. Stage 03

      Intervene while it is cheap

      Track category A punch and missing records weeks before the gate, while the crews who can clear them are still mobilised.

    4. Stage 04

      Accept against evidence

      Issue acceptance with the dossier already compiled per subsystem — every certificate traceable to the records that support it.

    Side by side

    Contractor reporting versus owner visibility.

    Both describe the same project. Only one of them can be opened and checked.

    Weekly reporting pack

    • Completion figure

      Manually entered, reported after the fact

    • Verification

      Request the sheet, wait for the scan

    • Punch visibility

      Summary counts by contractor

    • Handover dossier

      Delivered at the end, reviewed under time pressure

    • Across projects

      Different formats, rebuilt each cycle

    Deskely owner view

    • Completion figure

      Derived live from signed records

    • Verification

      Open the record from the dashboard

    • Punch visibility

      Every item with category, owner, photo and blocked milestone

    • Handover dossier

      Visible and complete throughout the project

    • Across projects

      One comparable readiness model

    Who it serves

    Built for the people who sign the acceptance.

    Owner access is read-only by default and scoped by project, so your teams get transparency without touching the contractor's execution.

    Portfolio

    Project directors & sponsors

    Comparable readiness across projects, with the same definition of complete applied to every contractor on every site.

    Technical

    Owner's engineers & inspectors

    Drill from a certificate to the signed ITR, the punch history and the photo evidence behind it in a few clicks.

    Operations

    Operations & maintenance teams

    Preservation history, as-built records and the final dossier arrive structured against the asset register you will run.

    We stopped asking for status packs. We open the project, look at what is signed, and the conversation with the contractor starts from the same facts.

    Project directorAsset owner, power sector

    Before you shortlist

    Estimate what your current process costs

    Enter your tag count and record handling time to see the admin hours and cost in play — then book a demo against your own numbers.

    Open the ROI calculator

    FAQ

    Questions from owners.

    Ready to digitize
    commissioning and
    handover?