Industries

    The same completions problem, shaped differently by every sector.

    Tags, records, punch and certificates are common to every commissioning scope. What changes is the volume, the connectivity, the number of parties and how the evidence gets audited. Pick a sector — or go straight to your project type.

    12
    Sectors covered end to end
    119
    Project types with their own page
    1
    Tag register behind all of them
    100%
    Field capture works offline

    12 sectors, one completions model.

    Each sector page walks the full picture: where the evidence normally breaks down, how the register is structured, what gets signed in the field and what the handover pack looks like on the last day.

    01Energy and resources

    Production, generation and extraction assets where the register runs to tens of thousands of tags.

    6 sectors · 59 project types

    10 project types

    SYS 21 — SCOPE BOUNDARYSignedIn progressOpen18,400 tags

    Oil and gas

    Tens of thousands of tags, layered MC/RFSU certification, multi-year preservation and an operator who audits the trail before taking custody.

    LNG trains and gas processingFPSO and floating productionBrownfield tie-ins and turnarounds+7 more

    9 project types

    ARRAY A — TURBINE STATUSSignedIn progressOpen2 of 3 energised

    Offshore wind

    The same record set repeated across every turbine, executed offline inside nacelles, rolled up to fleet-level readiness.

    Fixed-bottom wind farmsFloating offshore windOffshore substations and platforms+6 more

    10 project types

    SYS 40 — ENERGISATIONSignedIn progressOpen2 of 3 bays live

    Power and grid

    System turnover packages, protection and loop test evidence, and energisation gating from first fire to PAC and FAC.

    Gas turbine and combined cycle plantsHydropower units and powerhousesBiomass and waste-to-energy plants+7 more

    10 project types

    PV BLOCK 04 — STRING TO GRIDINVSignedIn progressOpen3 of 4 strings signed

    Solar and energy storage

    Repeatable string, inverter and BESS records at scale, rolled up block by block to grid connection and first dispatch.

    Utility-scale solar farmCommercial rooftop solarBattery energy storage system (BESS)+7 more

    10 project types

    UNIT 1 — SYSTEM TURNOVERSignedIn progressOpen12 of 18 systems turned over

    Nuclear

    Safety-class qualification, turnover packages and outage critical path evidence held under one auditable register.

    New-build reactorSmall modular reactor (SMR)Nuclear plant life extension+7 more

    10 project types

    FLOWSHEET — WET COMMSignedIn progressOpen2 of 4 circuits wet

    Mining and minerals

    Pit, plant and port scopes held in one register — pre-commissioning checks, wet and dry commissioning and ramp-up evidence through to first metal.

    Open pit mine fleet and fixed plantUnderground mine shaft and ventilationOre processing plant and concentrator+7 more

    02Process and industrial

    Plants and vessels where regulated process systems are commissioned line by line.

    4 sectors · 40 project types

    03Critical facilities and built environment

    Buildings and mission-critical sites handed over to an operator on a fixed date.

    2 sectors · 20 project types

    Project type directory

    Go straight to your scope.

    An LNG train, a substation energisation and a hospital handover share a data model but almost nothing else about how the work is run. Every project type below has its own page with the register structure, certification gates and field workflow written for that scope.

    LNG, FPSO, platforms, subsea, refineries, pipelines, terminals and turnarounds.

    Oil and gas overview
    LNG trains and gas processingLiquefaction scopes carry the densest loop testing and the longest preservation windows in the industry, and the operator gates start-up one train at a time. Deskely keeps the records, the certification ladder and the readiness number at that same level.FPSO and floating productionTopsides in one yard, hull in another, integration in a third and hook-up offshore. Deskely keeps a package's history attached to the package itself, so what was tested at the fabricator is still provable after sail-away.Brownfield tie-ins and turnaroundsA shutdown gives you a fixed number of days on a live plant and no room for reconciliation afterwards. Deskely lets the scope be structured before the window opens, executed on tablets during it, and certified before the plant is handed back.Fixed platforms and jacketsBed space and weather decide how much can be finished offshore. Deskely makes onshore completion provable subsystem by subsystem, so the offshore campaign is spent only on work that genuinely could not be closed at the quayside.Subsea tie-backsUmbilicals, jumpers, control systems and the host topsides interface are tested in stages by different parties. Deskely holds those records under one subsystem so SIT results, offshore installation checks and topsides commissioning read as a single chain.Refineries and petrochemicalRefinery and petrochemical scopes have two customers: the project that has to finish, and the operating organisation that keeps the records for the life of the unit. Deskely produces evidence that satisfies both, including the pre-start-up safety review.Pipelines and compressor stationsA transmission scope is not one asset. It is a linear spread of test sections, block valve stations, pig traps and compressor or pump stations, each with its own hydrotest, cleaning, gauging, drying and tie-in evidence. Deskely holds that evidence against the section and the station it belongs to, so acceptance by the pipeline operator is a query rather than an archive search.Terminals, tank farms and jettiesStorage and export facilities are judged on two things: whether the tank can be filled safely, and whether the meter that leaves the fence line can be trusted. Deskely keeps tank, jetty, metering and fire protection evidence in one register so both answers are provable on the day the first cargo is scheduled.Hydrogen, ammonia and carbon captureElectrolysers, ammonia loops, capture units and CO₂ injection wells are being built by teams doing them for the first time, on schedules set by subsidy deadlines and offtake agreements. Deskely gives these scopes the same completions discipline as an LNG train, with the tightness, purity and measurement evidence these plants are judged on.Decommissioning and late lifeTaking an asset apart is a completions project in reverse. Every system has to be isolated, drained, flushed, made hydrocarbon free and certified as safe before a cutting torch goes near it — and the regulator's close-out report is written from that evidence. Deskely holds it against the tag from the first isolation to the final removal.

    What stays constant, what changes per sector.

    Sector-specific completions tools tend to hard-code one certification ladder. Deskely keeps the data model fixed and makes the sector differences configuration, so a contractor working across sectors runs one system.

    Constant everywhere

    • A controlled tag register

      One list of tags, systems and subsystems that every record, punch item and certificate is written against.

    • Records signed at the asset

      A, B and C inspection and test records completed in the field on tablets, online or offline, then signed.

    • Punch that gates completion

      Defects raised at the tag with photos, categorised so the ones that block certification actually block it.

    • A dossier that exports itself

      Certificates and their underlying evidence assembled continuously, so handover is an export rather than a project.

    Different per sector

    • Volume and repetition

      Tens of thousands of unique tags on an LNG train, versus the same short record set repeated across 100 turbines.

    • Who signs

      Operator, class society, yard, notified body or plant owner — each expects a different signature ladder.

    • Where the work happens

      Nacelles, engine rooms, live process units and subsea spreads all mean disconnected capture and late sync.

    • How it gets audited

      Some sectors sample the dossier at handover; others audit the trail continuously before taking custody.

    Questions we get asked.

    See pricing

    Is Deskely commissioning software for a specific industry?

    No. Deskely is a completions and commissioning platform built on a tag register, inspection and test records, punch lists, preservation and certification. Those elements are the same in oil and gas, offshore wind, power, data centre, manufacturing, marine, building and mining projects. What changes per sector is the volume of tags, the certification ladder and who audits the evidence, and all of that is configured rather than custom built.

    Which industries does Deskely support?

    Oil and gas, offshore wind, power generation and grid, solar and energy storage, data centres and mission-critical facilities, manufacturing, marine and shipyards, buildings and infrastructure, and mining and minerals — each with its own project-type pages beneath it.

    Can one system cover several project types at once?

    Yes. Each project has its own register, templates and certification model, while the underlying platform, users and reporting stay shared. A contractor running a refinery turnaround and an offshore hook-up can run both in Deskely without maintaining two toolsets.

    How long does it take to set up a new project?

    The register is usually the long pole, and the AI drawing parser turns P&IDs, line lists and equipment lists into a reviewed tag register in days rather than months. Templates, systems and signature rights are configured alongside it, so a project can start capturing records in the field within the first weeks.