From engineering drawings to a traceable handover.
Two products, one source of truth. The AI Drawing Parser builds your tag register from P&IDs and indexes; Deskely commissioning software executes it — ITRs, preservation, punch lists, walkdowns, and handover.
No credit card required · 14-day trial (cancel anytime)
M-02A
Strainers / Filters
Please review image.
Two products, one source of truth. AI reads the drawing set and builds the tag register. Deskely runs every check, punch, and certificate against it.
Build the scope
Your scope, live in weeks. AI reads the P&IDs and the EPC handover pack, builds the tag register and assigns checksheets. Engineers review, they don’t retype.
1 · Source documents
Every project record goes in
P&ID set
21-PID · Rev C
18 drawings
Equipment list
Aurora equipment.xlsx
1,086 rows
Instrument index
Instrument index · Rev B
2,214 rows
Vendor handover pack
Vendor dossier 07
36 files
2 · Deskely AI · Drawing Parser
Reads the drawings, builds and reconciles the scope
Read documents
AI agent · OCR + symbol detection
Extract tags
AI agent · Equipment · valves · instruments
Match sources
AI agent · Revision + description checks
Assign checksheets
AI agent · By type and discipline
4,264
AI matched
48
For review
99%
Coverage
4 · Draft tag register
Approved records flow through
Crude transfer pump A
Pressure safety valve
Firewater deluge valve
3 · Engineer review
One conflict, fully explained
The AI proposes the latest approved source. An engineer remains in control of the master record.
21-PSV-2103 · description conflict
AI flaggedPressure safety valve, separator inlet
PSV separator inlet
Execute completions
Every check, on the system it belongs to. Checksheets and punch items raised in the field land on the right system and subsystem, so completion is tracked where handover actually happens.
01 · Field execution
Complete the check at the asset
Main LV switchboard inspection
Form No-E-02A · Tag 83-SWBD-01 · Module M04
Nameplate matches approved single-line diagram *
Switchboard installed, levelled and anchored *
03Confirm specifications against approved GA drawing *
Verify section width and bus-coupler arrangement before energisation.
Busbar bolt torque recorded (Nm) *
45NmBreakers / contactors racked and operate freely *
Lars Eide · Electrical
Same live record
Check · evidence · signature
03 · Office control
System completion dashboard
System progress
74%
Checks signed
96 / 130
Open punch
19
System 83 · Electrical distribution
Subsystem completion
83-SWBD-01 updated
just nowBreaker operation verified · evidence and signature linked
Govern the process
One governed source of truth. Every sign-off follows the sequence: nothing gets certified with open A-punch, and every step is on record for owner, EPC and vendor.
ITR signed
Vendor signed checksheet 21-P-1101A
Validate scope
Matched to 21-PID-0012 · Rev C
Clear certification gate
Confirm zero open Category A punch
If
Category A punch open?
Route for sign-off
EPC lead, then owner rep
Hold certificate
3 Category A items remain open
Forecast handover
Know when each system hands over. Ask about any system. From RFSU dates to what is blocking them, the answer comes from live checksheet and punch data, not last week’s report.
System readiness forecast
43 · Firewater
Current
91%
Plan RFSU
05 Nov
Forecast
12 Nov
Forecast drivers
Live evidence behind the date
Category A punch
6 open on subsystem 43-02
Vendor ITR
FW pump B awaiting upload
Owner sign-off
14 checksheets in queue
Recovery scenario
Close the six A-punch items by 04 Nov and approve the vendor ITR to recover 4 days.
Hand over to operations
Hand over a dossier, not a pile. Certificates, checksheets and punch closeout compile as you go, so operations starts on day one with everything on record.
System 21 · Crude handling
Aurora FPSO · Commissioning to operations transfer
Aurora FPSO
System 21 dossier
Operations index · Rev 0
Operations ready
1,482 records verified
One indexed, searchable package with every record traceable to the system and asset.
Assets included
Package integrity
100% verified structure
Track Record
Deployed on major offshore programmes, not pilots.
In production since
First deployment on an offshore asset programme.
Asset programmes
FPSO construction, commissioning and early operations.
Operators served
Deployed with operator and EPC teams on both sides of handover.

FPSO Errea Wittu
Stabroek Block, Guyana

FPSO RAIA
Campos Basin, Brazil
FPSO Carioca
Sépia field, Brazil
FPSO Guanabara
Mero field, Brazil
FPSO Miamte
Bay of Campeche, Mexico
FPSO BW Catcher
UK North SeaPricing
Start free. Scale per project.
Evaluate on a sandbox project at no cost, move to per-user pricing for a single project, and license per project or per asset programme as scope grows.
Compare all plans and limitsFree
$0
Evaluation sandbox
- 1 sandbox project
- Up to 3 users
- ITR and Punch modules
Plus
$29
per user / month, billed annually
- Up to 50 users
- All seven modules
- Offline tablet execution
Pro
Custom
Per project, unlimited users
- Unlimited users
- Higher record volumes
- Advanced reporting
Enterprise
Custom
Multi-asset programmes
- Unlimited projects
- SSO / SAML with SCIM
- Dedicated success manager
FAQ