Manufacturing

    Commissioning software for plants that have to start producing on the date they promised.

    New lines, plant expansions and equipment replacements all end the same way: a handover where someone has to prove every machine was installed, tested and accepted. Deskely holds that evidence from first delivery to first product.

    LINE 1 — ACCEPTANCE BY CELLL1-CELL-010FAT + SATInfeedL1-CELL-020FAT + SATFormL1-CELL-030SAT openWeldL1-CELL-040SAT dueInspectLINE READY62%2 of 4 cells accepted

    The problem

    Production dates do not move, so the paperwork gets compressed.

    Manufacturing commissioning runs against a fixed production start. When the schedule tightens, the testing evidence is the thing that gets deferred — and it is exactly the thing needed to accept the plant.

    WHERE THE EVIDENCE LIVESVendor FAT packPDF scanSAT sheetsExcelSnag listEmail threadUtility sign-offsPaperPRODUCTION START14 daysIs Line 1 ready?Unknownfour systems disagreeOne register removes the reconciliation entirely.

    FAT and SAT records scatter

    Factory acceptance evidence arrives from vendors in a dozen formats, and site acceptance testing is recorded separately again.

    Line-level scope is unclear

    Equipment is tracked by purchase order rather than by the production line it belongs to, so line readiness cannot be reported.

    Snags block start-up invisibly

    Outstanding defects are held in emails and a shared spreadsheet, and their impact on the go-live date only becomes clear late.

    Vendors leave before close-out

    Commissioning engineers demobilise while their items are still open, and the plant inherits an unfinished list.

    How it runs

    From delivery to first product.

    1. 01

      Register the equipment

      Load the asset list and map each item to its line, cell or utility system.

    2. 02

      Record acceptance

      FAT evidence attached on arrival, SAT and installation checks signed on site.

    3. 03

      Walk the line

      Pre-start inspections raise snags with photos, categorised by production impact.

    4. 04

      Accept and hand over

      Line acceptance issued against cleared records, with the dossier ready for operations.

    LINE READINESS SEQUENCEEquipment registerMachines mapped to lines01100%FAT acceptedVendor evidence attached02100%SAT on siteSigned against the asset0368%Line handoverPunch cleared to start0424%Every gate reports from the same records — no separate status spreadsheet.

    Side by side

    Shared drives versus a single acceptance record.

    The question at every manufacturing handover is the same: can you show this machine was tested and accepted?

    Shared drives versus a single acceptance record.
    AspectFolders and spreadsheetsDeskely
    Vendor documentsPDFs in a shared drive, named inconsistently.Attached to the asset record they belong to.
    Line readinessEstimated in a meeting.Derived from signed records per line.
    SnagsA spreadsheet with no link to go-live.Categorised and gating the acceptance certificate.
    Field capturePaper on the floor, retyped later.Tablet capture with photos, offline capable.
    Operations handoverA box of documents assembled at the end.A structured dossier built as the work happens.

    What changes

    Per line

    readiness reporting that matches how you start up

    One place

    for FAT, SAT, installation and inspection evidence

    Gated

    acceptance on cleared blocking snags

    Scoped

    vendor access to their own records only

    Before you shortlist

    Estimate what your current process costs

    Enter your tag count and record handling time to see the admin hours and cost in play — then book a demo against your own numbers.

    Open the ROI calculator

    FAQ

    Questions about manufacturing.

    Project types

    The same completions model, from a single line to a whole plant.

    What changes between manufacturing scopes is the shape of the asset breakdown, the gate that matters and who signs. The record types, the acceptance ladder and the audit trail behind them do not.

    01

    Greenfield plants and new factories

    A greenfield plant is built by a general contractor, filled by a dozen equipment suppliers and accepted by an operations team that arrives late. Deskely holds the building services, utilities and production equipment in one register with a certification order that reflects how the plant actually starts.

    See this scope in detail
    02

    Production line installation and SAT

    A production line is a chain of stations, conveyors, robots and controls that only produces value when every link is proven. Deskely tracks installation, hook-up, functional testing and SAT per station, so the line is accepted as a line rather than as a pile of machines.

    See this scope in detail
    03

    Automotive body, paint and assembly

    Body shop, paint shop and final assembly are three different engineering problems delivered against one start-of-production date. Deskely holds every robot, cell, conveyor and utility in one register, with acceptance gated per zone so the ramp does not depend on a single spreadsheet.

    See this scope in detail
    04

    Food, beverage and hygienic process

    Food and beverage projects combine process skids, CIP systems, filling lines and packaging halls under hygiene and food safety requirements that have to be demonstrated, not asserted. Deskely holds the mechanical, functional and hygienic evidence against the same assets.

    See this scope in detail
    05

    Pharmaceutical and life sciences facilities

    In a regulated facility, commissioning evidence is the foundation the qualification effort stands on. Deskely holds installation and functional records against every asset in a controlled, signature-traceable way, so IQ and OQ start from good data instead of rebuilding it.

    See this scope in detail
    06

    Battery gigafactories and cell plants

    A gigafactory stacks electrode coating, calendering, assembly, formation and ageing on top of dry rooms, solvent recovery and heavy utilities. Deskely holds all of it in one register with dependencies modelled, so equipment is not commissioned into a room that cannot hold dew point.

    See this scope in detail
    07

    Semiconductor fabs and cleanroom fit-out

    A fab is a facility project and a tool installation programme running at the same time. Deskely tracks cleanroom, ultrapure water, bulk and specialty gases, exhaust, chilled water and power as subsystems, and every tool hook-up as an asset that depends on them.

    See this scope in detail
    08

    Warehouse automation and intralogistics

    Automated storage, conveyor networks, sorters, shuttles and robotics are highly repetitive scopes with very high asset counts. Deskely templates the record set once and instantiates it across every module, so checkout progress is measured instead of estimated.

    See this scope in detail
    09

    Pulp, paper, steel and heavy process

    Paper machines, pulp lines, rolling mills and smelters start as a whole. Deskely holds the mechanical, electrical, instrumentation and drive evidence per system so the start-up sequence runs against proven equipment rather than assumptions.

    See this scope in detail
    10

    Brownfield upgrades and line relocations

    Retrofits, line moves and capacity upgrades happen in short windows inside a live plant. Deskely gives the window a defined record set, live readiness and punch that is owned before restart, so production is not the thing that discovers the gaps.

    See this scope in detail

    Ready to digitize
    commissioning and
    handover?

    We use cookies to improve your experience.
    You can opt out of certain cookies.
    Find out more in our privacy policy.