From engineering drawings to a traceable handover.

    Two products, one source of truth. The AI Drawing Parser builds your tag register from P&IDs and indexes; Deskely commissioning software executes it — ITRs, preservation, punch lists, walkdowns, and handover.

    No credit card required · 14-day trial (cancel anytime)

    deskely
    Hull 482 — Completions
    Search tags, ITRs…⌘K
    OA
    FavouritesDefaultNew
    Header Text
    Button Group
    Single line text
    Text field with labels
    Radio Button
    Checkboxes
    Table
    Text Box
    Date Picker
    Image
    ITR Templates/M-02A/Design Template

    M-02A

    Strainers / Filters

    Preview
    1. Inspection checklist:
    1. Vendor inspection and test completed. *
    YesNoNA
    2. Confirm nameplate is installed and correct to design specification. *
    YesNoNA
    Manufacturer
    Type / Model no.
    Serial no.
    Data sheet no.
    3. Confirm specifications

    Please review image.

    FRONT ELEVATION8 × Ø18 EQ. SP.248 ±1.0Ø200653 mm GASKETSECTION A—A · SCALE 1:21VERIFY GASKET GAPDN80 FLANGED CONNECTIONASME B16.5 · CLASS 150 RFDWG 21-ME-10421:2REV C
    Go Back
    Save as DraftSave & Publish
    ExxonMobil logo — Deskely customer
    MODEC logo — Deskely customer
    Equinor logo — Deskely customer
    Straits Bio LNG logo — Deskely customer
    Compass Energy logo — Deskely customer
    Platform

    Two products, one source of truth. AI reads the drawing set and builds the tag register. Deskely runs every check, punch, and certificate against it.

    Build the scope

    Your scope, live in weeks. AI reads the P&IDs and the EPC handover pack, builds the tag register and assigns checksheets. Engineers review, they don’t retype.

    Scope build · Aurora FPSO
    58 source files48 min processing

    1 · Source documents

    Every project record goes in

    P&ID set

    21-PID · Rev C

    18 drawings

    Equipment list

    Aurora equipment.xlsx

    1,086 rows

    Instrument index

    Instrument index · Rev B

    2,214 rows

    Vendor handover pack

    Vendor dossier 07

    36 files

    2 · Deskely AI · Drawing Parser

    Reads the drawings, builds and reconciles the scope

    AI working
    PTLTP-1101AV-210199.4%98.1%96.7%
    21-PID-0014 · Rev C3 tags detected in view

    Read documents

    AI agent · OCR + symbol detection

    18 / 18

    Extract tags

    AI agent · Equipment · valves · instruments

    4,312

    Match sources

    AI agent · Revision + description checks

    4,264

    Assign checksheets

    AI agent · By type and discipline

    4,312

    4,264

    AI matched

    48

    For review

    99%

    Coverage

    4 · Draft tag register

    Approved records flow through

    21-P-1101A

    Crude transfer pump A

    3 sourcesP-01 · P-07
    21-PSV-2103

    Pressure safety valve

    2 sourcesV-04
    43-XV-0305

    Firewater deluge valve

    2 sourcesV-03 · I-12
    Ready now4,264
    Review queue48

    3 · Engineer review

    One conflict, fully explained

    The AI proposes the latest approved source. An engineer remains in control of the master record.

    21-PSV-2103 · description conflict

    AI flagged
    21-PID-0014 · Rev CAI proposed

    Pressure safety valve, separator inlet

    21-PID-0014 · Rev BSuperseded

    PSV separator inlet

    97% AI confidence · source revision verified

    Execute completions

    Every check, on the system it belongs to. Checksheets and punch items raised in the field land on the right system and subsystem, so completion is tracked where handover actually happens.

    Live execution · Aurora FPSO · System 83
    Field + office connected

    01 · Field execution

    Complete the check at the asset

    LELars Eide · M04
    12:04Wi-Fi  ·  92%
    Checksheets / Electrical / E-02AOffline-ready

    Main LV switchboard inspection

    Form No-E-02A · Tag 83-SWBD-01 · Module M04

    7 / 10
    70%
    Activity 1–1011–14PicturesPunchSign
    ITR activitiesRequired fields *
    Identification & installation
    01

    Nameplate matches approved single-line diagram *

    YesNoN/A
    02

    Switchboard installed, levelled and anchored *

    YesNoN/A

    03Confirm specifications against approved GA drawing *

    Verify section width and bus-coupler arrangement before energisation.

    Open drawing
    6800 ±2 OVERALL2200 ±2INCOMER ABUS COUPLERMCC FEEDERSINCOMER BFRONT ELEVATION · MAIN LV SWITCHBOARDDWG 83-EL-2041 · REV C1VERIFY SECTION WIDTHMATCH APPROVED GA
    YesNoN/A
    04

    Busbar bolt torque recorded (Nm) *

    45Nm
    07

    Breakers / contactors racked and operate freely *

    YesNoN/A
    Evidence · IMG_2148
    Module M04
    Review & sync

    Lars Eide · Electrical

    02 · Sync

    Same live record

    Check · evidence · signature

    03 · Office control

    System completion dashboard

    Live

    System progress

    74%

    Checks signed

    96 / 130

    Open punch

    19

    System 83 · Electrical distribution

    Subsystem completion

    MC target · 14 Oct
    83-01Main LV distribution
    96%
    118 / 123
    83-02Emergency switchboards
    74%
    96 / 130
    83-03Motor control centres
    61%
    68 / 112

    83-SWBD-01 updated

    just now

    Breaker operation verified · evidence and signature linked

    Govern the process

    One governed source of truth. Every sign-off follows the sequence: nothing gets certified with open A-punch, and every step is on record for owner, EPC and vendor.

    TriggerTriggered

    ITR signed

    Vendor signed checksheet 21-P-1101A

    Governance stepCompleted

    Validate scope

    Matched to 21-PID-0012 · Rev C

    Governance stepCompleted

    Clear certification gate

    Confirm zero open Category A punch

    Decision gateCompleted

    If

    Category A punch open?

    TrueFalse
    Governance stepCompleted

    Route for sign-off

    EPC lead, then owner rep

    ExceptionBlocked

    Hold certificate

    3 Category A items remain open

    Forecast handover

    Know when each system hands over. Ask about any system. From RFSU dates to what is blocking them, the answer comes from live checksheet and punch data, not last week’s report.

    System readiness forecast

    43 · Firewater

    7 days behind plan

    Current

    91%

    Plan RFSU

    05 Nov

    Forecast

    12 Nov

    22 Oct29 Oct05 NovToday12 Nov
    ActualPlanned trajectory

    Forecast drivers

    Live evidence behind the date

    01

    Category A punch

    6 open on subsystem 43-02

    High
    02

    Vendor ITR

    FW pump B awaiting upload

    High
    03

    Owner sign-off

    14 checksheets in queue

    Medium

    Recovery scenario

    Close the six A-punch items by 04 Nov and approve the vendor ITR to recover 4 days.

    Revised forecast08 Nov 2026

    Hand over to operations

    Hand over a dossier, not a pile. Certificates, checksheets and punch closeout compile as you go, so operations starts on day one with everything on record.

    Final stage · Operations handover

    System 21 · Crude handling

    Aurora FPSO · Commissioning to operations transfer

    Signed checksheets340 / 340
    Every record linked to its asset
    Certificates7 / 7
    MC · RFC · RFSU · SHC
    Punch closeout0 Cat A open
    44 items closed with evidence
    Vendor records28 / 28
    Indexed to equipment tags
    Compile + verify

    Aurora FPSO

    System 21 dossier

    Operations index · Rev 0

    01System definition
    02Asset register
    03Completion records
    04Punch closeout
    05Certificates
    06Vendor records

    Operations ready

    1,482 records verified

    One indexed, searchable package with every record traceable to the system and asset.

    Assets included

    21-P-1101A21-PSV-210321-LT-4407

    Package integrity

    100% verified structure

    Track Record

    Deployed on major offshore programmes, not pilots.

    2014

    In production since

    First deployment on an offshore asset programme.

    10

    Asset programmes

    FPSO construction, commissioning and early operations.

    5

    Operators served

    Deployed with operator and EPC teams on both sides of handover.

    FPSO Errea Wittu offshore vessel
    ExxonMobil
    Uaru
    Live deployment

    FPSO Errea Wittu

    Stabroek Block, Guyana
    250,000 bpd
    Oil processing
    2.0M bbl
    Storage
    1,690 m
    Water depth
    FPSO RAIA offshore vessel
    Equinor
    BM-C-33
    Live deployment

    FPSO RAIA

    Campos Basin, Brazil
    125,000 bpd
    Oil processing
    2.0M bbl
    Storage
    2,900 m
    Water depth
    FPSO Carioca offshore vessel
    Petrobras
    MV30
    MODEC fleet

    FPSO Carioca

    Sépia field, Brazil
    180,000 bpd
    Oil processing
    1.4M bbl
    Storage
    2,200 m
    Water depth
    FPSO Guanabara offshore vessel
    Libra Consortium
    MV31
    MODEC fleet

    FPSO Guanabara

    Mero field, Brazil
    180,000 bpd
    Oil processing
    1.4M bbl
    Storage
    1,930 m
    Water depth
    FPSO Miamte offshore vessel
    Eni
    MV34
    MODEC fleet

    FPSO Miamte

    Bay of Campeche, Mexico
    90,000 bpd
    Oil processing
    700,000 bbl
    Storage
    32 m
    Water depth
    FPSO BW Catcher offshore vessel
    Harbour Energy
    BW Catcher
    Historical reference

    FPSO BW Catcher

    UK North Sea
    60,000 bpd
    Oil processing
    650,000 bbl
    Storage
    90 m
    Water depth

    Pricing

    Start free. Scale per project.

    Evaluate on a sandbox project at no cost, move to per-user pricing for a single project, and license per project or per asset programme as scope grows.

    Compare all plans and limits

    Free

    $0

    Evaluation sandbox

    • 1 sandbox project
    • Up to 3 users
    • ITR and Punch modules

    Plus

    $29

    per user / month, billed annually

    • Up to 50 users
    • All seven modules
    • Offline tablet execution

    Pro

    Custom

    Per project, unlimited users

    • Unlimited users
    • Higher record volumes
    • Advanced reporting

    Enterprise

    Custom

    Multi-asset programmes

    • Unlimited projects
    • SSO / SAML with SCIM
    • Dedicated success manager

    FAQ

    Frequently asked questions.

    Ready to digitize
    commissioning and
    handover?

    14-day Pro trial on a sandbox project — all core modules, offline execution, no credit card required.

    We use cookies to improve your experience.
    You can opt out of certain cookies.
    Find out more in our privacy policy.