Decommissioning, late life and removal

    Decommissioning evidence built forward, not reconstructed at the end.

    Taking an asset apart is a completions project in reverse. Every system has to be isolated, drained, flushed, made hydrocarbon free and certified as safe before a cutting torch goes near it — and the regulator's close-out report is written from that evidence. Deskely holds it against the tag from the first isolation to the final removal.

    Direction
    Reverse commissioning
    Certification
    Made safe per system
    Constraint
    Ageing documentation
    Final audience
    Regulator
    PLATFORM A — TOPSIDES REMOVALLEGACY P&ID 12-044 · REV 7Jacket — later phase12-PW12-SEP12-FGRemovedClear for removalNot yet made safeCUT LINE — TOPSIDES LIFT46 isolation points proven — system 12-SEPHeavy lift vesselTAG REGISTER12-V-101First stage separatorA-ITR signed12-PV-118Blowdown valve — not in C…B-ITR open12-P-204Produced water pumpPreservation12-TK-330Slop tank — NORM suspectedPunch A open2 900 tagsunder one system hierarchy

    The problem

    The asset's own records are thirty years old.

    Late-life assets are documented by accumulation: original construction drawings, decades of modifications, a maintenance system migrated twice, isolation registers kept on paper by shift teams, and institutional knowledge held by people who have since retired. The as-built condition is genuinely uncertain in places.

    Decommissioning has to start by re-establishing what is actually there, system by system, and then prove that each system has been isolated, drained, flushed and made free of hydrocarbon and other hazards before a cutting torch is released against it.

    The end product is not a working plant but a report: a close-out submission to the regulator, plus waste and materials records that follow everything removed. If that evidence was captured on paper by different crews across a multi-year campaign, the final reporting exercise becomes its own project.

    WHAT IS ACTUALLY OUT THEREPlatform A — built 1992LEGACY DRAWINGSMAINTENANCE SYSTEM12-V-101On P&ID rev 7=12-V-101In maintenance system12-PV-118On P&ID rev 712-PV-118Not in the system12-LV-072Removed in 200912-LV-072Still an active tag12-TK-330On P&ID rev 412-TK-330NORM flagged, no survey1 180modifications over 34 years62systems to isolate and make safeConflicts are surfaced for walkdown before the first isolation.

    Re-establishing the register

    Rebuild the tag list before removing anything.

    The first task is a register that reflects the asset as it is, not as it was designed. Legacy P&IDs, marked-up as-builts, the maintenance system export and the isolation philosophy are parsed into a tag register, with conflicts between sources surfaced for engineer review rather than silently resolved.

    Where a source disagrees — a valve on the drawing but not in the maintenance system, a line modified without the drawing being updated — the conflict is shown with both references so a walkdown can settle it before isolation begins, which is where discrepancies are cheapest to find.

    The register then becomes the spine of the campaign: every isolation, drain, flush, cut and item removed is recorded against a tag the whole team agrees exists.

    How legacy drawings are parsed
    1 · SOURCE DOCUMENTSLegacy P&IDs rev 1–72 900 tagsAs-built mark-ups1 180 changesMaintenance system export7 640 recordsIsolation philosophy62 systemsPARSE + MATCHtag · description · drawing ref2 · ONE TAG REGISTER12-V-101First stage separator12-SEP12-PV-118Blowdown valve — not in C…12-SEP12-P-204Produced water pump12-PW12-TK-330Slop tank — NORM suspected12-SLPTWO DOCUMENTS DISAGREELegacy P&IDs rev …Blowdown valve — not in CMMSAs-built mark-upsAbbreviated descriptionEngineer picks the sourcedecision loggedWeeks of transcription become a draft an engineer reviews.

    The ladder in reverse

    Isolation to clear-for-removal, each gated on the record beneath it.

    Decommissioning runs the certification ladder backwards: instead of building up to mechanical completion, a system is progressively made safe until it can be cut.

    CERTIFICATION LADDER5 gatesICIsolation confirmedLOTO applied and verified at the point of isolationIsolating authorityDAFDrain and flush completeIsolation confirmed, drain record and flush volume loggedDecommissioning leadHFHydrocarbon freeSampling result within specification, NORM and hazard surveycompleteProcess safety engineerCFRClear for removalNo open Category A finding against the system, hazard findingsclosed or transferred to specialist scopeDecommissioning managerRACRemoved and consignedWeighbridge ticket and disposal or reuse route recordedagainst the tagMaterials and wastecontrollerEach gate is claimable only when the records beneath it are signed.
    1. 01

      Isolation confirmed

      LOTO applied and verified at the point of isolation

      Isolating authority

    2. 02

      Drain and flush complete

      Isolation confirmed, drain record and flush volume logged

      Decommissioning lead

    3. 03

      Hydrocarbon free

      Sampling result within specification, NORM and hazard survey complete

      Process safety engineer

    4. 04

      Clear for removal

      No open Category A finding against the system, hazard findings closed or transferred to specialist scope

      Decommissioning manager

    5. 05

      Removed and consigned

      Weighbridge ticket and disposal or reuse route recorded against the tag

      Materials and waste controller

    Made safe

    A certificate that says this system is safe to cut.

    A clear-for-removal certificate cannot be issued while a drain record is missing, a sampling result is outstanding or a Category A finding is open against the system — the same gating logic as new build, applied to a hazard being retired rather than a plant being started.

    Naturally occurring radioactive material, mercury, asbestos, residual chemicals and stored energy are recorded as their own findings against the tag where they were found, so the specialist scope that follows is planned from evidence rather than a verbal handover between shifts.

    Isolations are held against tags with their point, method, owner and current state, so the live picture across a multi-year campaign is a query rather than a paper register kept by whichever shift was on at the time.

    Certificates and gates
    SYSTEM 12-SEP — MADE SAFE LADDERThe commissioning ladder, run in reverse.ISOIsolation confirmedIssuedIsolation points proven46 / 46Stored energy releasedConfirmedPhotographic recordAttachedHCFHydrocarbon free9 records to clearDrain and flush records38 / 41Atmosphere samplingWithin limitsNORM survey2 findings openCFRClear for removalGatedHydrocarbon free cert.PendingHazard findings closed2 openWaste routing agreedApproved

    Campaign execution

    Offshore days are the budget, same as hook-up.

    A removal campaign has the same constraints as an offshore construction campaign: bed space, vessel days, weather and a lift schedule that cannot be rearranged casually. What can be done onshore or before the vessel arrives should be, and what remains has to be sequenced against readiness that is actually proven.

    Progress is reported by system state — isolated, flushed, hydrocarbon free, cleared, removed — rather than by percentage complete, because a lift plan needs to know which structures are ready to cut, not what the average is.

    Records are captured on tablets at the tag, offline, by the crews doing the work, with photographs of the isolation and the condition found — the same field discipline as a commissioning campaign, which keeps the reporting burden inside the working day.

    Field execution
    MAKE-SAFE SEQUENCE PER MODULEIsolate · clean · cut · removeM02 Process moduleM05 UtilitiesM06 Power generationLiving quartersFlare towerISOLATECLEANCUTREMOVE62systems with a signed isolation certificate18hazardous inventories evidenced cleanCutting is only released when the clean certificate above it is signed.The removal contractor works from evidence, not from a thirty-year-old drawing.

    What actually blows the schedule

    Late-life risk concentrates around uncertainty, not process.

    SCHEDULE EXPOSURECONTROLLEDAs-built drawings don't match realityParse all legacy sources together and surface conflicts forwalkdown before the campaign starts.Hazard found without a planLog every finding against the tag with photographs the momentit is discovered, so specialist scope is planned from…Vessel days lost to unproven readinessReport progress by system state, not percentage complete, sothe lift plan only schedules genuinely cleared structures.Waste chain of custody breaksAttach weighbridge tickets and disposal notes to theoriginating tag at the point of transfer, not retrospectively.4 failure modes carried on the register, each with a named control.
    01

    As-built drawings don't match reality

    A valve that exists on the drawing but not in the maintenance system is found during isolation instead of before it.

    Parse all legacy sources together and surface conflicts for walkdown before the campaign starts.

    02

    Hazard found without a plan

    NORM, mercury or asbestos discovered mid-campaign stalls the removal sequence while specialist scope is arranged reactively.

    Log every finding against the tag with photographs the moment it is discovered, so specialist scope is planned from evidence.

    03

    Vessel days lost to unproven readiness

    A structure is scheduled for lift before its clear-for-removal certificate is actually signed.

    Report progress by system state, not percentage complete, so the lift plan only schedules genuinely cleared structures.

    04

    Waste chain of custody breaks

    A consignment cannot be traced back to the tag it came from when the close-out report is compiled.

    Attach weighbridge tickets and disposal notes to the originating tag at the point of transfer, not retrospectively.

    Inventory, waste and chain of custody

    Decommissioning is proven by where the material went, which makes the waste chain a completions record set in its own right.

    RECORDS PRODUCED4 typesWeighbridge ticketEvery transfer between platform,…Disposal or reuse consignment noteAt final disposal or recyclingNORM / mercury / asbestos surveyDuring made-safe scope, before removalPhotograph of isolation and…At isolation, drain, flush and removalDOSSIERIndexed persubsystem and tagExport readyEach record lands in the same structure, so the dossier assembles itself.

    Weighbridge ticket

    Tonnage removed matches what is declared in the close-out report

    Every transfer between platform, transport barge and dismantling yard

    Disposal or reuse consignment note

    Material reached a licensed route, supporting recycling claims made in the comparative assessment

    At final disposal or recycling

    NORM / mercury / asbestos survey

    Hazardous findings were identified, quantified and managed at source

    During made-safe scope, before removal

    Photograph of isolation and condition found

    The physical state at the point of intervention, independent of written description

    At isolation, drain, flush and removal

    Close-out

    The final report is an export, not a rewrite.

    The close-out submission needs to show, per system, what was isolated, how it was made safe, what hazardous material was found and how it was managed, what was removed, where it went and who signed each step — all of it already in the register if it was captured there in the first place.

    Materials and waste consignments are recorded against the tags they came from, so the traceability chain from a specific piece of equipment to its disposal or reuse route survives the campaign.

    The export is generated per system and per campaign phase with signer name, role, organisation and timestamp on every record — turning a multi-year removal programme into a submission that can be defended rather than assembled.

    AUDIT QUERY12-TK-330Slop tank · NORM finding at removal6 records returned · 0.3 sISOIsolation confirmationM. Sørensen — OIM11 Jan 2026FLUSHDrain and flush recordCampaign crew26 Jan 2026NORMSurvey and scale samplingRadiation protection02 Feb 2026WASTEConsignment to disposal routeWaste contractor18 Mar 2026PHOTOCondition found, 14 imagesField captureTime-stampedCERTIFICATECFR-12-SLPClear for removalIssued 21 Mar 2026Signed A. Whyte — Duty holderPrerequisites demonstratedThe regulator's close-out submission exports per system from the same signed records.

    How it runs

    How a decommissioning scope is set up in Deskely.

    The same structure as a completions project, run in the opposite direction, with the regulator as the final reader.

    1. 01

      Re-establish the register

      Legacy drawings, as-built mark-ups and the maintenance system export are parsed into a tag register with conflicts flagged for walkdown.

    2. 02

      Break the asset into removal systems

      Systems and structures are defined as the units that will be isolated, made safe and removed, so certification matches the physical sequence.

    3. 03

      Define the reverse ladder

      Isolation, drain and flush, hydrocarbon free and clear for removal are configured as gates, each dependent on the signed records beneath it.

    4. 04

      Record hazards where they are found

      NORM, mercury, asbestos, residual chemicals and stored energy are logged against the tag with photographs, so specialist scope is planned from evidence.

    5. 05

      Execute the campaign on tablets

      Crews capture isolations, flushes, samples and removals offline at the tag, with system state reported instead of a blended percentage.

    6. 06

      Export the close-out evidence

      Per-system packs and waste traceability records export in the structure the regulator and the duty holder require.

    FAQ

    Questions about Decommissioning scopes.