Turnarounds and brownfield tie-ins

    Turnaround management where close-out happens inside the window.

    A shutdown gives you a fixed number of days on a live plant and no room for reconciliation afterwards. Deskely lets the scope be structured before the window opens, executed on tablets during it, and certified before the plant is handed back.

    Duration
    Days, not months
    Plant state
    Live and adjacent
    Execution
    Offline on tablets
    Close-out
    Before hand-back
    TA-26 — UNIT 12 TIE-IN SCOPETIE-IN LIST 12-TA26 · REV ELive linesSPOOL OUT12-TI-014Line 12-P-208 · isolated and blinded12-E-105SHUTDOWN WINDOW — 18 DAYSDay 11 — nowStartHand backTAG REGISTER12-TI-0146" tie-in spool, line 12-…A-ITR signed12-PSV-221Relief valve overhaulB-ITR open12-E-105Exchanger bundle pullPreservation12-XV-330New ESD valvePunch A open184 tie-insunder one system hierarchy

    The problem

    The window is the whole constraint, and paperwork eats it.

    A turnaround is planned for eighteen months and executed in fourteen to twenty-five days. Every hour of the window is costed against lost production, which means the work that happens inside it has to be execution — not deciding what the scope is, not building forms, not working out who signs.

    What usually happens instead is that the register is still being assembled while the plant is already down. Scopes arrive late from inspection findings, tie-in packages are tracked on a separate sheet, and the punch item raised on day two is on a clipboard nobody reconciles until the week after start-up.

    Then the plant is handed back and the documentation trails it by a month. For work that sat next to live hydrocarbons, that gap between the job and its evidence is exactly what the operator's post-turnaround audit finds first.

    THE WINDOW IS THE CONSTRAINTTA-26 — 18 daysStartDay 6Day 12Day 18Plant down, no production12-03 Exchanger bundlesclosed12-07 Tie-in pack 07in progress12-09 ESD upgradein progress12-11 Late scope 12-P-311found on openingpast hand-backDay 11 — nowRECORDS PER DAY380signed on tablets, two shiftsTIME FOR RECONCILIATION0 daysthe plant restarts on scheduleDeskely closes the record inside the window, not the week after.

    What the window actually holds

    The numbers a turnaround manager is already carrying in their head.

    14–25

    days in a typical unit turnaround window

    vs 18+ months of planning

    1,000+

    contractor personnel through the gate at peak

    on a mid-size unit

    30–40%

    of scope that is discovery work, not planned

    found once vessels are opened

    0

    days of slack for reconciling paper after hand-back

    Before the window

    Structure the scope while the plant is still running.

    Everything that can be decided in advance should be. Tie-in points, replaced spools, new instruments and modified subsystems are set up as their own subsystems with their ITR sets attached weeks before the shutdown starts, so the register is complete on day zero rather than day ten.

    Where the scope comes from a drawing package rather than a list, the parser drafts the tag register from the tie-in drawings and line lists for an engineer to review — which matters most when a scope arrives three weeks before the window and there is no senior engineer free to type it.

    Late additions from inspection findings, opened vessels or NDT results are added as subsystems in the same structure rather than as an appendix, so the growth work is visible in the same readiness view as the planned scope, not buried in a change log.

    See how the AI drawing parser works
    1 · SOURCE DOCUMENTSTie-in list 12-TA26 rev E184 tie-insIsolation / blind list342 pointsLate-scope sketches26 sheetsInspection scope (RBI)97 itemsPARSE + MATCHtag · description · drawing ref2 · ONE TAG REGISTER12-TI-0146" tie-in spool, line 12-…12-0712-PSV-221Relief valve overhaul12-0712-E-105Exchanger bundle pull12-0312-XV-330New ESD valve12-09TWO DOCUMENTS DISAGREETie-in list 12-TA…Relief valve overhaulIsolation / blind…Abbreviated descriptionEngineer picks the sourcedecision loggedWeeks of transcription become a draft an engineer reviews.

    The certification ladder

    The same gates as a greenfield scope, met in days instead of months.

    A turnaround does not get a shortcut on the ladder — it gets less time to climb it, which is exactly why the gate has to be enforced by data rather than by memory.

    CERTIFICATION LADDER5 gatesIVIsolation verifiedIsolation certificate signed against the P&ID, LOTO appliedand tagged at the point of work.Permit issuer and areaauthorityMCTMechanical completion (tie-in)All A and B records signed for the modified subsystem, statictest packs closed, no open Category A punch.Contractor QA/QC leadand client constructionrepPTAPressure test acceptedHydro or pneumatic test witnessed and recorded against theline or vessel tag.Independent inspectorRFSURFSU (re-instatement)Commissioning checks complete, de-isolation sequence followed,no blocking punch beneath the subsystem.Commissioning lead andoperations shiftsupervisorUHBUnit hand-backAll subsystems on the unit at RFSU, outstanding Category Bpunch carried with an owner and a date.Turnaround manager andplant managerEach gate is claimable only when the records beneath it are signed.
    1. 01

      Isolation verified

      Isolation certificate signed against the P&ID, LOTO applied and tagged at the point of work.

      Permit issuer and area authority

    2. 02

      Mechanical completion (tie-in)

      All A and B records signed for the modified subsystem, static test packs closed, no open Category A punch.

      Contractor QA/QC lead and client construction rep

    3. 03

      Pressure test accepted

      Often a third-party or client inspection authority, separate from the contractor.

      Hydro or pneumatic test witnessed and recorded against the line or vessel tag.

      Independent inspector

    4. 04

      RFSU (re-instatement)

      Commissioning checks complete, de-isolation sequence followed, no blocking punch beneath the subsystem.

      Commissioning lead and operations shift supervisor

    5. 05

      Unit hand-back

      All subsystems on the unit at RFSU, outstanding Category B punch carried with an owner and a date.

      Turnaround manager and plant manager

    During the window

    Signed at the tag on the day, not typed up on the Monday after.

    Field crews work from tablets at the tag. A record is completed where the work happened, a punch item is raised with a photograph the moment it is found, and both are signed by the person who did the job with the time they did it.

    Connectivity inside a unit is unreliable and the app does not assume it. Records are captured offline and synchronise when the device is back in coverage, keeping the original signature time rather than the sync time — which matters when a regulator later asks what time a valve was actually re-instated.

    Because progress is derived from those signatures, the 06:00 shift handover meeting reads a live number. What is outstanding on the tie-in scope is a query against the register, not a reconstruction from three supervisors' notebooks.

    Field ITR capture
    SHUTDOWN CLOCK — CRITICAL PATH18 day window, hour 96D0D3D6D9D12D15D18NOWIsolation and blindingCompleteVessel entry and inspectionCompleteExchanger bundle pullRunningTray replacement C-201Found on openingReinstatement and leak testNot startedDe-blinding and hand-backNot started+14 hlate scope added to the path312ITRs raised on found scopeScope found on opening is templated and issued in minutes, not typed overnight.Hand-back is declared from signed reinstatement records, hour by hour.

    What blows the window

    Four failure modes that turn a planned shutdown into an extended one.

    SCHEDULE EXPOSURECONTROLLEDScope creep from opened equipmentNew scope is entered as a subsystem in the live register themoment it is identified, inheriting the same certification…Permit-to-work bottleneckWork packs, isolation lists and ITR sets are issued togetherso a crew's readiness to start is visible before they queue at…Punch reconciled after re-instatementPunch is raised against the tag at the point of discovery andblocks RFSU automatically until it is closed or formally…Evidence assembled after start-upThe certificate package exports per subsystem directly fromthe signed record set, available the day the plant restarts.4 failure modes carried on the register, each with a named control.
    01

    Scope creep from opened equipment

    A vessel is opened, inspection finds unplanned corrosion, and the repair scope arrives with no ITR set, no subsystem and no owner — tracked on a side sheet until it collides with the critical path.

    New scope is entered as a subsystem in the live register the moment it is identified, inheriting the same certification ladder as planned work.

    02

    Permit-to-work bottleneck

    Multiple contractors queue for the same isolation or the same physical space, and the permit office becomes the schedule constraint rather than the work itself.

    Work packs, isolation lists and ITR sets are issued together so a crew's readiness to start is visible before they queue at the permit desk.

    03

    Punch reconciled after re-instatement

    Punch raised during execution sits on paper until after systems are re-instated, so a Category A item is discovered only once the unit is already being brought back up.

    Punch is raised against the tag at the point of discovery and blocks RFSU automatically until it is closed or formally deferred.

    04

    Evidence assembled after start-up

    The dossier is built retrospectively from scanned test packs once the plant is running again, delaying the close-out report the operator needs for the next campaign.

    The certificate package exports per subsystem directly from the signed record set, available the day the plant restarts.

    What the close-out report is built from

    The records a plant manager checks before signing the unit back to operations.

    A turnaround's close-out report is only as fast as the records feeding it. These six are the ones most often chased after re-instatement rather than captured during the work, and each is tied to the tag it belongs to as it is signed.

    RECORDS PRODUCED6 typesBlind list and reinstatement…Closed at de-isolation, before…Positive material identification…During pipe fit-up, ahead of hydrotestHydrotest and leak-test packAfter tie-in welding, before…Isolation certificate close-outAt de-isolation, ahead of RFSUNDT and radiography reportImmediately after welding, before…Punch clearance recordReviewed at RFSUDOSSIERIndexed persubsystem and tagExport readyEach record lands in the same structure, so the dossier assembles itself.

    Blind list and reinstatement register

    Every blind installed for the shutdown has been removed and the line restored to its normal configuration

    Closed at de-isolation, before re-instatement

    Positive material identification record

    Replaced spools and fittings match the specified alloy before the line is pressurised

    During pipe fit-up, ahead of hydrotest

    Hydrotest and leak-test pack

    A repaired or new line holds pressure at the code-required test value

    After tie-in welding, before re-instatement

    Isolation certificate close-out

    The isolation applied for the work has been formally cancelled and the boundary returned to service

    At de-isolation, ahead of RFSU

    NDT and radiography report

    Tie-in welds meet the acceptance criteria before the line is put back into service

    Immediately after welding, before hydrotest

    Punch clearance record

    No Category A item remains open beneath the subsystem being re-instated

    Reviewed at RFSU

    Hand-back

    The certificate package exists when the plant restarts.

    Mechanical completion for a tie-in subsystem is gated the same way as on a greenfield scope: no unsigned A record beneath it, no open Category A punch. The difference is only that the gate is met in days rather than months.

    Category B items that will genuinely be closed during normal operations are carried with an owner and a date instead of being written off at hand-back, which is what makes the outstanding list credible to the operating organisation receiving it.

    The dossier for the shutdown scope exports per subsystem in the operator's retention structure, with every signature, photograph and timestamp preserved — available the day the plant comes back up rather than a month later.

    AUDIT QUERY12-TI-014Tie-in pack 12-07 · Piping5 records returned · 0.3 sFIT-UPFit-up and alignmentR. Novak — QCDay 4, 07:40NDT 21Radiography releasedInspectionDay 5, 16:20TEST 12Hydrotest 34 bargK. Dahl — Comm.Day 9, 11:05PUNCH1 Cat B carriedAccepted by opsDay 9, 15:00REINSTReinstatement checklistOps shift leadDay 10, 06:15CERTIFICATEHB-12-07Hand back to operationsIssued Day 10, 08:30Signed A. Reidar — OpsPrerequisites demonstratedThe turnaround dossier is finished when the window is — no post-restart record chase.

    Who owns what during the shutdown

    Six parties on the same permit board, reading the same register.

    Turnaround manager

    Overall schedule, critical path and go/no-go for unit re-instatement.

    Signs

    Live subsystem readiness view across the whole unit.

    Contractor supervisor

    Crew allocation, work pack execution and punch clearance for their scope.

    Signs

    Signed ITRs and closed punch items filtered to their subsystems.

    Client construction rep

    Verifying mechanical completion before commissioning takes the subsystem.

    Signs

    Reviewed and countersigned B records.

    Permit issuer / area authority

    Isolation validity and simultaneous work clearance at the tag.

    Signs

    Isolation certificate linked to the active permit and subsystem.

    Independent inspector

    Pressure test witnessing and code compliance sign-off.

    Signs

    Test certificate attached to the line or vessel tag record.

    Operations shift supervisor

    De-isolation sequence and acceptance of the unit back into operation.

    Signs

    RFSU certificate with no open Category A punch beneath it.

    How it runs

    How a turnaround is set up in Deskely.

    The aim is that nothing structural happens during the window. Everything that can be built in advance is built in advance.

    1. 01

      Build subsystems in advance

      Tie-in points, replaced equipment and modified loops are created as subsystems with ITR sets attached before the plant comes down.

    2. 02

      Draft late scope from drawings

      Scope arriving close to the window is parsed from tie-in drawings and line lists into a draft register for an engineer to review rather than typed from scratch.

    3. 03

      Assign crews and signature rights

      Contractors and inspection parties are scoped to their own packages, so nobody is waiting on a single administrator to update the master file.

    4. 04

      Execute offline at the tag

      Records, punch and photographs are captured on tablets inside the unit with no connectivity assumed, synchronising when the device is back in coverage.

    5. 05

      Close punch during the window

      Category A items are visible against the certificate they block, so the crew working the last shift knows exactly what stands between the scope and hand-back.

    6. 06

      Issue and export before restart

      Certificates are issued from the signed records and the dossier is exported per subsystem, so documentation does not trail the plant back into service.

    FAQ

    Questions about Turnarounds scopes.