[02 · Completions]

Deskely CoreFoundation

Tag register, ITRs, punch and handover in one system of record.

Book a demo
Commissioning & InspectionSearch...EnglishRS
Dashboard/CoreCompletions board
48,212 tags · 112 subsystems
FPSO Demo Project › Topsides › Utilities › All systems
Mechanical completion41
582-82-01Service water lift pumps92%ITRs 166/180Punch A 1
582-83-02Fire water ring main74%ITRs 133/180Punch A 4
586-11-01HV switchboard61%ITRs 110/180Punch A 7
Pre-commissioning29
582-82-02Service water distribution88%ITRs 158/180Punch A 2
430-01-01Seawater lift57%ITRs 103/180Punch A 7
Commissioning18
210-02-01Gas export71%ITRs 128/180Punch A 5
300-01-03HP separation45%ITRs 81/180Punch A 9
Handed over24
582-95-02Instrument air header100%ITRs 180/180Punch A 0
860-03-04Deck lighting100%ITRs 180/180Punch A 0

Overview

Core is the completions system of record: the live tag register with every inspection, punch item, preservation task, procedure and certificate attached to the tag it belongs to, from the yard to the field. It has run FPSO completions since 2014.

Core is part of Deskely Build, one of four suites across the life of a project. Every product reads from and writes to the same tag register, so each stage starts with clean data from the last.

Used by completions managers, commissioning leads, discipline engineers, owner's representatives and contractors.

What Core replaces.

Completions tracked in spreadsheets and email.

TodayA tracker per discipline, rebuilt from emails, and never quite the same twice.
With CoreOne live record: every tag with its ITRs, punch, procedures and certificates.
How Core works

One record, from the yard to the field.

How work on a tag becomes the project's completion status.

  1. 01Start from the tag register

    Tags arrive from Extract or Launch and sit in the full project hierarchy, from facility down to tag.

  2. 02Work is done against the tag

    ITRs, punch items, preservation tasks and procedures are attached to the tag they belong to, on the web and in the field app.

  3. 03Status rolls up

    Completion status by tag, subsystem, system and facility, updated as each record is signed.

  4. 04Certificates and handover

    MC, RFC and handover certificates, with a complete record for the handover dossier.

Core keeps the record. Your team signs the work.

Every record is attached to the tag it belongs to.

  1. 1The tag register

    Every tag in the project hierarchy, from facility down to tag.

  2. 2Completion status

    By tag, subsystem, system and facility, updated as each record is signed.

  3. 3Certificates

    MC, RFC and handover certificates, signed in Core.

Autonomous engineering runs on Deskely.

Talk to sales