[02 · Completions]

Deskely VerifyAI

Inspection and test records captured in the field and checked as they are signed.

Book a demo
Commissioning & InspectionSearch...EnglishRS
Checksheets›A›Form No-IN-04 (Tag No: 582-PT-820045-A01)
Form No-IN-04 (Tag No: 582-PT-820045-A01)
DetailsActivity Q(1-6)PicturesPunchListAttachmentSign
Deskely AI check

Tag found in the register · Range matches the datasheet · Readings within tolerance · Calibration certificate missing: the ITR is held until it is attached.

ITR ACTIVITIES
1. Tag plate matches the register *YesNoN/A
2. Installed per hook-up drawing HU-82-014 *YesNoN/A
3. Calibrated range *
0 to 40 barg
4. Calibration check *
Test pointApplied (barg)Output (mA)Error (%)
0%0.004.000.0
50%20.0012.020.1
100%40.0019.98-0.1
5. Process connection leak-free *YesNoN/A
6. Remarks
Add a remark

Overview

Verify puts every inspection and test record on the device in the inspector's hand. Each answer is checked against the register and the datasheet before the signature goes in, so mistakes are fixed on site instead of found in the office days later.

Verify is part of Deskely Build, one of four suites across the life of a project. Every product reads from and writes to the same tag register, so each stage starts with clean data from the last.

Used by inspectors and technicians, qa/qc engineers, discipline supervisors and completions managers.

What Verify replaces.

Paper ITRs, scanned and retyped.

TodayFilled in by hand on site, scanned and retyped, with mistakes found days later.
With VerifyAnswered on site and checked against the register and datasheet before it is signed.
How Verify works

From check sheet to signature.

What happens to an ITR, from the tag on site to the signature.

  1. 01Open the ITR on site

    The inspector opens the check sheet for the tag on a phone or tablet.

  2. 02Answer and measure

    Each question is answered on the spot, and readings are entered as they are taken.

  3. 03Checked before signing

    Each answer is checked against the register and the datasheet.

  4. 04Sign when it is right

    Anything missing holds the ITR. Once it is fixed, the inspector signs on site.

Verify does the checking. Inspectors make the calls.

An ITR is held until what is missing is fixed.

  1. 1Checked by Verify

    Each answer against the register and the datasheet: tag, range and readings.

  2. 2Held for review

    A missing certificate or a reading out of tolerance holds the ITR, with the reason.

  3. 3Your call

    The inspector fixes it on site and signs.

Autonomous engineering runs on Deskely.