Deskely AssetAI

An import-ready SAP PM or Maximo dataset from the completions record.

Book a demo
Commissioning & InspectionSearch...EnglishRS
Systems/AssetSAP PM build · Topsides utilities
✦ Import-ready · 0 errors
Functional locations
FPSO-DEMOFPSO Demo
FPSO-DEMO-TSTopsides
FPSO-DEMO-TS-UTUtilities
FPSO-DEMO-TS-UT-582Sea water systems
…-582-82-01Service water lift pumps
582-P-8202ALift pump A
582-P-8202BLift pump B
582-PT-820045Discharge pressure transmitter
Equipment 10004812Complete
Lift pump A · 582-P-8202A
ClassPUMP_CENTRIFUGAL
ManufacturerPumpTech
ModelVTP-250
Rated flow135 m³/h
Rated head62 m
Motor582-EM-8202A, 45 kW
From datasheet DS-0398-02 and vendor data book VDR-0398
Task list · proposed
Vibration check1 MMech
Alignment check6 MMech
Seal inspection12 MMech
Motor insulation test12 MElec
Spares
Mechanical seal×1BOM
Bearing set×2BOM
Coupling insert×1BOM

Overview

Asset builds the maintenance data the operator needs from day one, from the completions record itself: functional locations, equipment with their characteristics, spare parts and task lists, in your standards and ready to load into SAP PM or Maximo.

Asset is part of Deskely Operate, one of four suites across the life of a project. Every product reads from and writes to the same tag register, so each stage starts with clean data from the last.

Used by operator maintenance engineering, cmms and master data teams, operations readiness and reliability engineers.

What Asset replaces.

Outsourced maintenance data builds.

TodayLoad sheets built by hand from datasheets, then a load that fails on thousands of rows.
With AssetFunctional locations, equipment, spares and task lists, checked against your load rules before export.
How Asset works

From completions record to CMMS.

How the maintenance data is built from the record.

  1. 01Functional locations from the hierarchy

    The register and hierarchy in Core become functional locations, named to your standard.

  2. 02Equipment and characteristics

    Equipment records with characteristics filled from the datasheets and vendor documents, each traced to its page.

  3. 03Spares and task lists

    Spare parts are matched to materials, and task lists are proposed from the equipment class and vendor recommendations.

  4. 04Validate and export

    Every record is checked against your load rules, then exported for SAP PM or Maximo.

Asset does the building. Engineers make the calls.

Nothing is exported until engineers approve the task lists.

  1. 1Built by Asset

    Functional locations, equipment, characteristics and spares from the record.

  2. 2Flagged for review

    Records that fail your load rules, before anything is loaded.

  3. 3Your call

    Engineers approve the maintenance strategies and task lists.

Autonomous engineering runs on Deskely.