9Run for 4 hours and record readingsReadings logged every 30 min
Overview
Sequence drafts commissioning procedures from the P&IDs and the system register, in your own template, with every tag in every step linked to the register. When a drawing changes, the steps that depend on it are flagged, so procedures never drift from the design.
Sequence is part of Deskely Commission, one of four suites across the life of a project. Every product reads from and writes to the same tag register, so each stage starts with clean data from the last.
Used by commissioning engineers, commissioning leads, system owners and operations representatives.
What Sequence replaces.
Writing every procedure from scratch.
CP-582-82-01 Seawater Lift.docxPage 6
4 Procedure
4.1 Confirm the system is ready for start-up.
4.2 Open the shutdown valve XV-8200…
4.3 Start lift pump P-8202A and check
tag no? check P&ID
582-82-PR-PID-00001.pdfRev 2
TodayWritten in Word from the P&ID, with tags typed by hand and nothing linked to the register.
CP-582-82-01 · Seawater LiftDraft
StepTags
4.1 Confirm the ITRs are signed for the lift pumps582-P-8202A/B
4.2 Open the shutdown valve582-XV-820038
4.3 Start lift pump A582-P-8202A
4.4 Record the discharge pressure582-PT-820045
4.5 Confirm recycle flow control582-FIC-820008
✦ AIPrerequisites read live: 1 ITR open on 582-PT-820045
With SequenceA draft in your own template, with every tag in every step linked to the register.
How Sequence works
From P&ID to approved procedure.
What happens when a system needs its commissioning procedure.
01Choose the system
Sequence reads the P&IDs and the system register: the equipment, valves and instruments in the system and how they connect.
Commissioning & InspectionSearch...EnglishRS
Commissioning Procedures›New procedure
Choose a system✦ AI
Sequence drafts the procedure from the system's P&IDs and the system register, in your template.
Systems
582-82 Seawater582-82-01 Seawater liftNo CP582-82-02 FiltrationCP rev 1582-21 Separation582-43 Gas export582-63 Fire water
582-82-01 · Seawater liftDraft procedure
P&IDs
582-82-PR-PID-00001 · 3 sheets
Equipment
4
Valves
12
Instruments
18
Template
CP template v2
Vendor limits
VDR-P-8202-IOM-006
02The draft is written
Prerequisites, isolations, steps and acceptance criteria, in your own template.
Commissioning & InspectionSearch...EnglishRS
Commissioning Procedures›CP-582-82-01
CP-582-82-01 · Seawater lift start-up✦ AIDraft
System 582-82-01 · Template: CP template v2 · Drafted from 582-82-PR-PID-00001 and the system register
Preview PDF
Sections
1 Purpose and scope2 Prerequisites63 Isolations44 Procedure125 Acceptance criteria56 Sign-off
4 Procedure
4.1 Confirm the A-ITRs are signed for 582-P-8202A and 582-P-8202B.
4.2 Open the shutdown valve 582-XV-820038 from the control system and confirm the open feedback.
4.3 Start lift pump 582-P-8202A on minimum flow, with recycle valve 582-FV-820008 in auto.
4.4 Record the discharge pressure on 582-PT-820045 and confirm it is within 14 to 18 barg.
4.5 Confirm recycle flow control on 582-FIC-820008 at the set point.
5 Acceptance criteria
5.1 Pump runs for 4 hours with vibration below the vendor limit in VDR-P-8202-IOM-006.
03Every tag linked
Each tag in a step is linked to the register, and prerequisites such as signed ITRs and closed category A punch are read live.
Commissioning & InspectionSearch...EnglishRS
Commissioning Procedures›CP-582-82-01
CP-582-82-01 · Seawater lift start-up✦ AIDraft
System 582-82-01 · Template: CP template v2 · Drafted from 582-82-PR-PID-00001 and the system register
Preview PDF
4 Procedure
4.1 Confirm the A-ITRs are signed for 582-P-8202A and 582-P-8202B.
4.2 Open the shutdown valve 582-XV-820038 from the control system and confirm the open feedback.
4.3 Start lift pump 582-P-8202A on minimum flow, with recycle valve 582-FV-820008 in auto.
4.4 Record the discharge pressure on 582-PT-820045 and confirm it is within 14 to 18 barg.
4.5 Confirm recycle flow control on 582-FIC-820008 at the set point.
5 Acceptance criteria
5.1 Pump runs for 4 hours with vibration below the vendor limit in VDR-P-8202-IOM-006.
Prerequisites, read live2 open
PrerequisiteStatus
A-ITRs, 582-P-8202A/BSigned
B-ITR, 582-PT-820045Open
Punch cat. A, 582-82-011 open
TP-582-82-014 reinstated14 of 16
Isolations IS-82-01 to 04Ready
04Review and approve
Commissioning engineers edit, review and approve. When a drawing changes, the steps that use it are flagged.