    CxAlloy tracks issues against equipment. Facility Grid tracks commissioning against assets.

    These two come up together on building and data centre shortlists, and the distinction is genuinely fine. Both manage commissioning checklists, testing and issue resolution for facility projects. This page compares them on the dimensions that change the day-to-day experience, and is honest about the point where the whole category stops matching an industrial contract.

    RECORD STRUCTURE — ISSUE-LED VS ASSET-LED VS TAG-LEDCXALLOYEquipment recordsIssues per equipmentChecklist templatesCloseout documentationFACILITY GRIDAsset listsCommissioning checklistsFunctional performance testsOwner turnover packageDESKELY — COMPLETIONS SPINETag21-PT-1104ITR A + Bsigned evidencePunch A/Bcategory gatesSubsystemSS-2140CertificateMC / RFC / RFSUBoth organise around assets. Only the third column rolls tags into certifiable subsystems.

    The short answer

    CxAlloy vs Facility Grid: the verdict

    Best for
    Building and data centre teams weighing two asset-led commissioning platforms
    Last reviewed

    CxAlloy and Facility Grid are close relatives: both organise commissioning around assets or equipment and deliver an owner turnover package. CxAlloy's emphasis is issue tracking against equipment records; Facility Grid's is commissioning execution against asset lists and functional performance testing. Choose on which half of that sentence describes your reporting. If the client requires certified subsystems with enforced prerequisites, the requirement points outside this category entirely.

    Choose CxAlloy if

    • Reporting is driven by what issues remain outstanding
    • You work across many building projects or a portfolio
    • Equipment records with attached issues match your process

    Choose Facility Grid if

    • Reporting is driven by test and checklist completion
    • Functional performance testing is the centre of the scope
    • Operational readiness of a facility is the endpoint

    Choose Deskely if

    • Subsystems are certified against signed inspection records
    • The register comes from EPC and vendor data, not a facility asset list
    • Preservation and loop checks run against live equipment
    • Handover is judged on the completeness of the evidence dossier

    The problem

    Two asset-led models, one decision.

    Both are organised around assets or equipment rather than tags rolled into subsystems, which makes them closer to each other than either is to a completions system.

    Asset lists versus tag registers

    An asset list is a flat inventory of things to test. A tag register is a hierarchy where every record belongs to a subsystem that will be certified. The second is a contractual structure, not a filing preference.

    Where testing evidence lives

    Ask each vendor whether photos, readings and signatures bind to the individual record or attach to a project folder. At audit, the difference is hours versus days.

    Offline behaviour

    Data halls, plant rooms and roof plant all lose signal. Test whether records queue locally and sync on reconnect, rather than accepting mobile access as a yes.

    The turnover package

    Both produce owner turnover documentation. Neither is designed to refuse a certificate whose prerequisites are unmet, because that is not what building turnover requires.

    How it runs

    How to run the evaluation.

    1. 01

      Write down your handover deliverable

      A turnover package of completed equipment tests is a different artefact from a certified subsystem dossier. The deliverable decides the category before any demo does.

    2. 02

      Test the gate, not the feature list

      Ask each product to issue a completion certificate with an unsigned test record and an open category A punch. If it allows it, gating is advisory.

    3. 03

      Run one real subsystem

      Load a genuine equipment or tag list, execute the records, raise punch and close it out. A trial on real data separates the shortlist faster than a feature grid.

    4. 04

      Check the field case

      Test the mobile experience where the work actually happens, including with the device offline, before signing anything.

    Side by side

    CxAlloy vs Facility Grid, side by side.

    Based on each vendor's own public positioning. Both are established in building and data centre commissioning.

    CxAlloy vs Facility Grid, side by side.
    AspectCxAlloyFacility Grid
    Primary emphasisIssue tracking and equipment records.Commissioning execution against asset lists.
    Common scopesBuildings, healthcare, education, portfolios.Buildings and data centre commissioning.
    Organising structureProject, equipment, issue.Project, asset, checklist and functional test.
    DeliverableCloseout documentation and issue reporting.Owner turnover package.
    Subsystem certificationNot the design target.Not the design target.
    PricingQuote-based; not published.Quote-based; not published.

    What changes

    Asset-led

    both organise around assets, not subsystems

    Turnover

    package rather than gated certificates

    Data centres

    where the two shortlists overlap most

    Free plan

    to trial the completions model directly

    Before you shortlist

    Estimate what your current process costs

    Enter your tag count and record handling time to see the admin hours and cost in play — then book a demo against your own numbers.

    Open the ROI calculator

    FAQ

    Questions about cxalloy vs facility grid.

    Ready to digitize
    commissioning and
    handover?

    We use cookies to improve your experience.
    You can opt out of certain cookies.
    Find out more in our privacy policy.