Alternative

    Facility Grid targets operational readiness. Deskely targets contractual completion.

    Facility Grid is positioned around commissioning and operational readiness for buildings, giving owners and contractors a shared view of equipment status and testing. On an industrial asset, readiness is a consequence of certification — and certification is what the contract measures.

    SCOPE MODEL — ASSET COMMISSIONING VS SUBSYSTEM HANDOVERASSET-LED COMMISSIONING MODELAsset lists and checklistsFunctional performance testsIssues per assetOwner turnover packageDESKELY — TAG SPINETag21-PT-1104ITR A + Bsigned, evidence attachedPunchcategory A blocks issuanceSubsystemSS-2140 boundary completeCertificateMC issued, dossier builtAsset-by-asset sign-off does not answer whether a subsystem can be certified and handed over.

    The short answer

    Facility Grid alternative: the verdict

    Best for
    EPC completions with contractual milestones rather than operational readiness
    Last reviewed

    Facility Grid is oriented around operational readiness and commissioning for facilities, tracking equipment through checklists to turnover. Deskely is oriented around contractual completion on capital projects: subsystem certificates, category-gated punch and a per-subsystem dossier. The right pick depends on whether your endpoint is an operations-ready facility or a contractually accepted subsystem.

    Choose Facility Grid if

    • The goal is operational readiness of a building or campus
    • Equipment-level checklists match how your team works
    • There is no EPC certification hierarchy in the contract

    Choose Deskely if

    • MC, RFC and RFSU are contractual gates with evidence requirements
    • Tags come from EPC registers and P&IDs, not a facility asset list
    • Preservation and loop checks must be tracked against live equipment

    The problem

    Building commissioning and industrial completions are different problems.

    Both verify that equipment works before handover. They diverge on what the unit of record is, who signs it, and what the client is contractually owed at the end.

    The unit of record differs

    Building commissioning is organised around equipment and functional tests. Industrial completions is organised around tags rolled into subsystems, with certificates issued per subsystem.

    Gating is contractual, not procedural

    On an EPC scope, mechanical completion, ready-for-commissioning and ready-for-start-up are contractual milestones with defined evidence. The system has to refuse a certificate whose prerequisites are unmet.

    Punch is categorised, not just tracked

    A punch item that is category A blocks a certificate; category B does not. That distinction has to be enforced by the workflow, not by a label someone reads.

    The deliverable is a dossier

    The handover artefact is a structured, indexed evidence package per subsystem — not a report export. It has to be generated continuously, not assembled in the final months.

    How it runs

    Moving without losing history.

    1. 01

      Export from the incumbent

      Equipment or tag register, checklist status, issue list and document links.

    2. 02

      Map to tags and subsystems

      Records are attached to tags; tags are assigned to the subsystems the certificates will be issued against.

    3. 03

      Attach completed evidence

      Signed records from the previous system are carried across as evidence so the audit trail is continuous.

    4. 04

      Cut over by subsystem

      New execution moves subsystem by subsystem; the old platform becomes read-only history.

    Side by side

    Where each one fits.

    Different asset classes, different definitions of done.

    Where each one fits.
    AspectFacility GridDeskely
    Asset classBuildings and facilities.Process plant, energy and marine assets.
    Definition of doneOperational readiness for Day One.Certified subsystem handover per contract.
    Record hierarchyEquipment and test based.Tag, subsystem and certificate based.
    Punch modelIssue tracking to closeout.Categorised punch that gates certification.
    Field conditionsConnected site working.Offline-first, built for plant and offshore environments.
    Handover outputTurnover documentation and dashboards.Indexed dossier per subsystem with linked evidence.

    What changes

    Offline-first

    for plant, vessel and offshore work

    Contractual

    gates rather than readiness dashboards

    Tag-level

    traceability from record to certificate

    Continuous

    dossier assembly, not an end-of-job push

    Before you shortlist

    Estimate what your current process costs

    Enter your tag count and record handling time to see the admin hours and cost in play — then book a demo against your own numbers.

    Open the ROI calculator

    FAQ

    Questions about facility grid alternative.

    Ready to digitize
    commissioning and
    handover?