    CxPlanner plans the commissioning. Completions software proves it.

    CxPlanner combines commissioning checklists, punch and issue management with planning and scheduling, and is positioned as an accessible platform for commissioning professionals. Where it stops being the right shape is when the contract requires certified subsystem handover backed by an evidence trail.

    SCOPE MODEL — PROJECT CHECKLISTS VS COMPLETIONS SPINECHECKLIST-LED PROJECT MODELTask and checklist listsDocuments per projectDeviation logProgress by checklist countDESKELY — TAG SPINETag21-PT-1104ITR A + Bsigned, evidence attachedPunchcategory A blocks issuanceSubsystemSS-2140 boundary completeCertificateMC issued, dossier builtProgress counted from checklists is a tally; progress derived from signed records is a state.

    The short answer

    CxPlanner alternative: the verdict

    Best for
    Industrial commissioning where progress must be derived from signed evidence
    Last reviewed

    CxPlanner focuses on planning and coordinating commissioning activities — tasks, schedules and test plans across a project team. Deskely focuses on the evidence layer underneath: signed ITRs against tags, categorised punch, and certificates derived from what is actually complete. Teams that need a plan choose the former; teams whose contract turns on provable completion choose the latter.

    Choose CxPlanner if

    • The immediate gap is planning and coordinating test activities
    • Progress reporting from task status is sufficient for your client
    • The scope is building or facility commissioning

    Choose Deskely if

    • Reported progress must reconcile to signed records at audit
    • Certificates are contractual milestones with defined evidence
    • Offline tablet execution in the plant is a hard requirement

    The problem

    Planning tools and evidence systems answer different questions.

    A plan answers what should happen and when. A completions system answers what has been proven, by whom, against which tag, and whether the certificate can be issued.

    The unit of record differs

    Building commissioning is organised around equipment and functional tests. Industrial completions is organised around tags rolled into subsystems, with certificates issued per subsystem.

    Gating is contractual, not procedural

    On an EPC scope, mechanical completion, ready-for-commissioning and ready-for-start-up are contractual milestones with defined evidence. The system has to refuse a certificate whose prerequisites are unmet.

    Punch is categorised, not just tracked

    A punch item that is category A blocks a certificate; category B does not. That distinction has to be enforced by the workflow, not by a label someone reads.

    The deliverable is a dossier

    The handover artefact is a structured, indexed evidence package per subsystem — not a report export. It has to be generated continuously, not assembled in the final months.

    How it runs

    Moving without losing history.

    1. 01

      Export from the incumbent

      Equipment or tag register, checklist status, issue list and document links.

    2. 02

      Map to tags and subsystems

      Records are attached to tags; tags are assigned to the subsystems the certificates will be issued against.

    3. 03

      Attach completed evidence

      Signed records from the previous system are carried across as evidence so the audit trail is continuous.

    4. 04

      Cut over by subsystem

      New execution moves subsystem by subsystem; the old platform becomes read-only history.

    Side by side

    Where each one fits.

    CxPlanner is approachable and quick to start. Deskely is built for contractual completion evidence.

    Where each one fits.
    AspectCxPlannerDeskely
    EmphasisTest planning, checklists, scheduling.Evidence, certification and handover.
    Progress measurementChecklist and test completion.Weighted, derived from signed records per subsystem.
    CertificationReporting on completed tests.Gated MCC / RFC / RFSU with enforced prerequisites.
    PreservationNot a primary module.Scheduled routines with overdue exposure per tag.
    Data ingestionManual and import-based setup.P&ID and vendor register parsing into the tag model.
    Offline field useMobile access.Full offline execution and sync.
    Starting costEntry tier available.Free plan, then published tiers.

    What changes

    Derived

    progress instead of typed percentages

    Gated

    certificates with enforced prerequisites

    Preservation

    tracked against live equipment

    Parsed

    tag register from source drawings

    Before you shortlist

    Estimate what your current process costs

    Enter your tag count and record handling time to see the admin hours and cost in play — then book a demo against your own numbers.

    Open the ROI calculator

    FAQ

    Questions about cxplanner alternative.

    Ready to digitize
    commissioning and
    handover?

    We use cookies to improve your experience.
    You can opt out of certain cookies.
    Find out more in our privacy policy.