Apartment handover, riser testing, sectional completion
Commissioning software for towers where each apartment has to complete on its own record.
A residential tower repeats an apartment fit-out hundreds of times up a building whose risers, smoke control and life safety systems only work as a whole. Deskely tracks each apartment as an instance of a templated record while riser, smoke control and central plant scopes run as their own subsystems, so sectional completion is issued floor by floor with real evidence behind it.
- Unit
- Apartment, repeated by floor
- Shared
- Risers and smoke control
- Structure
- Sectional completion
- Gate
- Floor-by-floor handover
Choose your project type
The problem
Four hundred apartments, one riser, and a smoke control system that only makes sense as a whole.
Each apartment repeats the same fit-out — kitchen, bathroom, heating and ventilation, electrical and finishes — but sits on shared risers, a communal smoke control system and central plant that no single apartment owns.
Developers frequently need sectional completion, releasing sold apartments floor by floor while construction and commissioning continue above, which paper snagging lists cannot report reliably.
Deskely templates the apartment record once while modelling risers, smoke control and central plant as their own subsystems, so a floor's readiness reflects both its apartments and the shared systems it depends on.
Setting up the register
Apartments, floors and shared risers are structured to match the handover strategy.
A single apartment template — pre-functional checks, heating and ventilation, electrical, wet areas, finishes and snagging — is defined once and applied to every unit, keyed to the apartment number.
Risers, smoke control, sprinkler mains, communal plant, lift systems and life safety are modelled as separate subsystems that individual apartments depend on for their own completion.
Drawings, apartment schedules and riser diagrams are parsed into that structure, so the register reflects the actual sectional completion boundaries agreed with the employer's agent.
Execution
Apartment checkout and riser testing run on separate tracks that meet at each floor.
Apartment pre-functional checks, functional testing and snagging are captured on tablet unit by unit, with photos recorded against known defect categories.
Riser pressure testing, smoke control commissioning and communal life safety cause and effect testing are recorded against the floors and zones they serve, independent of individual apartment fit-out progress.
Punch is categorised by whether it blocks that specific apartment's handover or the floor's sectional completion, so one unfinished unit does not automatically hold up its neighbours.
Sectional completion and handover
Sections complete on evidence, with life safety proven before anyone moves in.
Sectional completion certificates are issued per floor or per core from the underlying apartment and riser records, with smoke control and life safety testing proven as a prerequisite for that section.
Individual apartment handover packs — O&M information, warranties, settings and snagging history — are exported to each purchaser or occupier as their unit completes, rather than compiled centrally at the very end.
Outstanding defects are carried into the defects liability period against the specific apartment or riser they belong to, with an owner and a date attached.
How it runs
From core and shell to a section ready to occupy.
Residential towers combine extreme repetition with shared critical systems, which is exactly the combination structured templating and subsystem modelling are built to handle.
- 01
Template the apartment
One pre-functional, functional and snagging record set defined once and applied to every apartment by number.
- 02
Model risers and shared systems
Risers, smoke control, communal plant and life safety modelled as subsystems that apartments depend on for completion.
- 03
Run checkout on two tracks
Apartment fit-out and riser/smoke control testing captured independently, each against its own record set.
- 04
Issue sectional completion
Certificates issued per floor or core once apartment and shared system records agree, with defects carried by owner.
FAQ
Questions about Mixed-use and residential towers scopes.
Keep reading
Buildings and infrastructure commissioning
The full sector view: MEP commissioning, Cx process, functional testing and soft landings handover.
Read morePunch lists
Defects and snags raised at the asset with photos, categorised by whether they block practical completion.
Read moreCertificates
Practical completion, commissioning and handover certificates issued from signed records.
Read moreOther building and infrastructure project types: Commercial office fit-out and base build commissioning, Hospital and healthcare facility commissioning, Airport terminal and transport hub commissioning, Rail and metro station and systems commissioning, Stadium and large venue commissioning, Hotels and hospitality commissioning, Education and campus commissioning, Tunnels and highways commissioning, Laboratory and research facility commissioning.