A short window, a growing work list

    Drydock software for a window that is fixed while the work list keeps growing.

    A drydocking is booked for a fixed number of days, priced against a defined work list, and then expanded the moment the hull is out of the water and inspections start finding things nobody quoted for. Deskely tracks the original scope and every growth item separately, so the yard and owner both know what the window actually costs.

    Duration
    Days to a few weeks
    Scope
    Fixed list plus growth
    Constraint
    Tide, dock availability
    Gate
    Redelivery to owner
    DRYDOCK 2 — HULL AND MACHINERYREPAIR SPEC LIST · REV BDRYDOCK NO. 3HULL-STBD-04propeller shaft surveyWORK LISTBlast & paintAnodesSea chestRudderKEEL BLOCKS AND BILGE BLOCKS — SET TO DOCKING PLANTAG REGISTERDD2-RUD-03Rudder bearing renewalRecords signedDD2-HULL-STL-41Bottom shell plate renewalIn testDD2-ME-LINER-02Cylinder liner replacementPreservationDD2-STB-01Stern tube seal renewalPunch open84 panelsunder one system hierarchy

    The problem

    The work list doubles on the second day, and nobody agreed to that in writing.

    The original specification covers hull cleaning, coating, anodes and a defined set of repairs. Underwater surveys, thickness gauging and class inspections routinely find corrosion, wastage or defects that were not visible when the specification was priced.

    Without a clean separation between the original scope and growth, the owner cannot see what changed and the yard cannot easily justify additional cost or schedule.

    Deskely tags every item as original or growth from the moment it is raised, so the work list stays negotiable in real time rather than becoming a dispute at redelivery.

    A FIXED WINDOW, A GROWING WORK LISTDrydock booking, 18 daysD0D3D6D9D12D15Docking window fixed at booking — cannot move without costWORK LIST GROWTH SINCE UNDERWATER SURVEYOriginal repair specification142 itemsFound on hull inspection, day 2+38 itemsFound on tailshaft withdrawal, day 5+19 itemsFound on tank internals, day 7+27 items+84items added after the window was booked18 daysfixed, whatever the work list doesDeskely tracks every added item against the same clock the yard is charged on.

    Setting up the register

    Hull sections, tanks and machinery carry the specification items that apply to them.

    The vessel is broken into hull sections, sea chests, rudder and propeller, tanks and the machinery items scheduled for overhaul during the window.

    The repair specification, class survey requirements and owner's supplementary list are parsed into the register against the relevant tag, so scope is visible per section before the vessel is even docked.

    This is what allows growth items discovered mid-docking to be added against the right tag immediately, with photos, rather than logged separately and reconciled later.

    1 · SOURCE DOCUMENTSRepair spec list rev B216 jobsSteel renewal plan84 panelsRudder and stern tube dr…12 sheetsMain engine overhaul sco…58 itemsPARSE + MATCHtag · description · drawing ref2 · ONE TAG REGISTERDD2-RUD-03Rudder bearing renewalSTEERINGDD2-HULL-STL-41Bottom shell plate renewalHULLDD2-ME-LINER-02Cylinder liner replacementMACHINERYDD2-STB-01Stern tube seal renewalSTEERINGTWO DOCUMENTS DISAGREERepair spec list …Bottom shell plate renewalSteel renewal planAbbreviated descriptionEngineer picks the sourcedecision loggedWeeks of transcription become a draft an engineer reviews.

    Execution

    Thickness gauging, coating and class survey leave a signed record at the tag they concern.

    Surveyors and technicians capture gauging readings, coating inspection results and repair records on tablet, at the hull section or tank they belong to.

    Findings that trigger growth are raised as a new item with photos and a reference to the reading or inspection that found them, with an owner assigned before the day is out.

    Because dock time is the most expensive resource in the project, every item shows how close it is to holding up flooding the dock.

    DOCK-IN THROUGH UNDOCKINGDrydocking and repairDock-in and underwater surveyRepair scope confirmed and frozenHull and tank repairs, coatingAll repair items closedTank testing and structural sign-off4 of 6 tanks signedClass surveySurveyor reviewing tank recordsUndockingAwaiting class sign-offSea trial and redeliveryAwaiting undockingUndocking is gated on signed tank and structural records, not a verbal all-clear from the dock master.

    Redelivery

    Redelivery is certified against the specification as it stood, growth included.

    The redelivery certificate lists the original specification items and every growth item, each with its closing record, so the owner sees exactly what was done against what was agreed.

    Any item not completed before undocking is carried explicitly with an owner and a plan, rather than silently dropped.

    That certificate is also what the yard uses to support its final invoice against agreed growth, reducing the scope for dispute after the vessel has sailed.

    Docking pack DD2-RUD-03 — handback ladderEvery gate closes inside the window, at the job cardJCJob cards completeIssued Day 8NDT on renewed steel84 / 84 releasedBlocking punch0 openTESTSteering gear sea trial prep4 records to clearBearing clearance records18 / 22 signedJob cards completeIssuedUDUndocking certificateGatedSteering gear testPendingClass surveynot scheduled

    Coating hold points and the tide

    Blasting, coating and anodes have cure times that do not care when the tide floods the dock.

    Hull blasting to the specified surface profile, primer and topcoat application, and anode replacement each have hold points and minimum cure or recoat windows set by the coating manufacturer, and a dock has a fixed number of tide cycles it can wait for a delayed coating to cure before flooding becomes unavoidable.

    A surveyor's hold point on surface preparation, a wet film thickness reading taken too early, or a coat applied outside its recoat window can turn a single afternoon's shortcut into days of rework once the paint has already failed adhesion testing.

    Deskely records surface preparation standard, dry and wet film thickness readings, coat number and cure time against the specific hull section, with the hold point enforced before the next coat or the next hull section can be marked ready, so the yard is deciding whether to flood the dock against actual coating data rather than the original schedule.

    UNDERWATER SURVEY CLOSE-OUTBefore undockingEvery item found on the initial survey traced to a signed repair recordHULL SURVEY FINDINGS, TRACED TO CLOSUREPlate thickness gauging, all zonesSea chest and valve overhaulAnode renewal, signed countTailshaft withdrawal and bearing clearanceOWNER'S REPRESENTATIVE SIGN-OFFEvery closed finding countersigned before the dock is floodedOpen findings block undocking, not just the invoice1 openfinding still blocking the undocking gateUndocking is gated on the survey close-out record, not a verbal sign-off on the quay.

    How it runs

    From dock entry to redelivery, on schedule.

    A drydocking is won or lost on how fast growth can be identified, priced and actioned without stopping work on the rest of the specification.

    1. 01

      Model the vessel for the docking

      Hull sections, sea chests, tanks and scheduled machinery tagged as the assets of the docking.

    2. 02

      Load the specification

      Repair specification, class requirements and owner's list parsed into the register against each tag.

    3. 03

      Capture surveys as they happen

      Gauging, coating and class inspection results recorded on tablet at the hull section or tank.

    4. 04

      Flag growth immediately

      Findings that expand scope raised as growth items, distinct from the original specification, with an owner and photos.

    5. 05

      Track dock-time risk

      Items that could hold up undocking surfaced continuously rather than discovered the day before flooding.

    6. 06

      Certify redelivery

      Redelivery certificate issued listing original and growth scope, with any carried items explicit.

    FAQ

    Questions about Drydocking and repair scopes.

    Ready to digitize
    commissioning and
    handover?

    We use cookies to improve your experience.
    You can opt out of certain cookies.
    Find out more in our privacy policy.