    Commissioning software for support vessels where mission equipment is as complex as the ship carrying it.

    Platform supply, construction support and walk-to-work vessels carry cranes, moonpools, dynamic positioning, gangways and mission-specific equipment on top of a standard hull. Deskely tracks hull and mission systems in one register with DP trials and equipment acceptance modelled as their own chain, so the vessel is proven as an integrated asset rather than a hull with attachments.

    Systems
    Cranes, DP, moonpool, gangway
    Trials
    DP trials and FMEA
    Class
    DP notation dependent
    Gate
    Sea trials and delivery
    DP2 THRUSTER ROOM — HULL 214OSV BUILD SPEC · REV BBRIDGEOSV-CRN-01MOONPOOLDP THRDP THRDP2 sea trial pendingOFFSHORE SUPPORT VESSEL — WORK DECK LAYOUTTAG REGISTERDP-THR-03Bow thruster no. 3Records signedDP-REF-ADP reference system A (DG…In testDP-GEN-02Diesel generator, DP powe…PreservationDK-WNCH-01Anchor handling winchPunch open3 independent systemsunder one system hierarchy

    The problem

    The hull is proven first, and mission equipment is proven last, under pressure.

    Cranes, moonpools, active heave compensation, gangways and DP systems are commissioned by specialist vendors on their own schedules, often arriving late in the build against a fixed delivery date.

    When these systems live in separate vendor documentation, the yard discovers integration problems — power management conflicts, DP reference system interference, deck load limits — during sea trials rather than before.

    Deskely holds hull, mission equipment and DP systems in one register with cross-system dependencies modelled, so integration issues surface while there is still time to resolve them on the berth.

    MISSION EQUIPMENT, FOUR SEPARATE OEMSOSV mission systemsCrane, DP, moonpool and ROV handling each arrive with their own commissioning teamOffshore crane, 150 tCrane OEM — factory acceptance testsea trial readyDynamic positioning, DP2DP OEM — factory acceptance testsea trial readyMoonpool and LARSHandling OEM — factory acceptance testown trial scheduleROV hangar systemsROV OEM — factory acceptance testown trial schedule4 schedulesthat all have to line up for a single sea trial slot1 vesselacceptance depends on every system, not the averageDeskely reconciles all four OEM commissioning tracks against one sea trial date.

    Setting up the register

    Hull, mission equipment and DP are linked subsystems, not separate projects.

    Cranes, moonpool and handling systems, gangways, ROV spreads, active heave compensation and DP reference systems each hold their own equipment lists and record sets, cross-linked to the power management system that ties them together.

    General arrangements, mission equipment layouts and vendor drawings are parsed into a reviewed register, so every winch, thruster and reference sensor carries its drawing and its interface points.

    That structure is what allows the yard to sequence DP trials against actual equipment readiness instead of a fixed calendar date.

    1 · SOURCE DOCUMENTSOSV build spec rev B1 hullDP system architecture3 independent systemsThruster arrangement dra…4 thrustersDeck machinery schedule18 itemsPARSE + MATCHtag · description · drawing ref2 · ONE TAG REGISTERDP-THR-03Bow thruster no. 3THRUSTER ROOMDP-REF-ADP reference system A (DG…DP CONTROLDP-GEN-02Diesel generator, DP powe…POWERDK-WNCH-01Anchor handling winchDECK MACHINERYTWO DOCUMENTS DISAGREEOSV build spec re…Diesel generator, DP power …DP system archite…Abbreviated descriptionEngineer picks the sourcedecision loggedWeeks of transcription become a draft an engineer reviews.

    Execution

    Vendor commissioning and integration testing captured against the same asset register.

    Vendors and yard technicians sign installation, functional test and integration records on tablets at the equipment, including power management and thruster allocation logic.

    Punch is raised with photos and categorised by whether it blocks DP trials, sea trials or delivery, so DP-critical findings are never mixed in with cosmetic outfit items.

    Progress rolls up per mission system and per hull zone, which is the level the trials programme is actually managed at.

    MISSION EQUIPMENT COMMISSIONING LADDEROSVHull and outfitting completeMechanical completion signedDP system commissioningDP2 capability trial passedCrane load test150 t crane, dynamic test in progressMoonpool and ROV handling trialsAwaiting crane test close-outSea trials and deliveryAwaiting all mission systemsSea trials wait for every mission system's own commissioning gate, not just the hull.

    Trials and delivery

    DP trials and sea trials depend on a chain of equipment and integration evidence.

    DP trial and FMEA proving trial readiness depends on individual equipment acceptance and power management commissioning, each enforced as a prerequisite from the records beneath.

    The dossier per mission system gives the owner and the class surveyor the test results, settings and drawings needed to close out DP notation and vessel delivery together.

    Residual punch from sea trials stays live with owners and dates through to redelivery from the yard rather than disappearing into a trials report.

    Thruster pack DP-THR-03 — DP capability ladderClass and DP notation both gate on independence evidenceMCMechanical completionIssued 19 AprThruster installation records4 / 4 signedAlignment verifiedcompleteFMEAFMEA proofing trialReady — booked with classFailure mode tests logged38 / 38Independence of power systemsverifiedDPTDP capability trialBlocked — 5 itemsBlocking punch5 openClass DP notation surveynot scheduled

    Moonpool and diving system class notation

    A moonpool and a saturation diving system carry their own class notation, and their commissioning does not fit a standard hull acceptance form.

    Moonpool structures, diving bells, saturation systems and ROV launch and recovery systems each carry class notations and statutory requirements — pressure vessel certification for the dive system, structural approval for the moonpool opening, life support system testing — that sit outside a conventional hull and machinery commissioning scope.

    Confined space entry into the moonpool trunk and diving system compartments during commissioning carries its own hazard profile, and the record of gas testing and permits for that entry is exactly the kind of evidence an owner's rep or class surveyor will ask for months after the vessel is delivered.

    Deskely holds moonpool, diving and ROV systems as their own subsystems with their statutory record sets and confined space entry permits attached to the equipment tag, so specialist acceptance evidence is not separated from the vessel's main commissioning record.

    MISSION EQUIPMENT INTERFACE ACCEPTANCECrane, DP, moonpool combinedFour OEM commissioning tracks accepted together at the interface, not separatelyINTERFACE ACCEPTANCE EVIDENCECrane and DP interlock testMoonpool and ROV handling interface testCombined power management load testBridge integration and alarm mappingWHY INDIVIDUAL OEM ACCEPTANCE IS NOT ENOUGHEach system can pass its own FAT and still fail combined power loadThe vessel-level interface test is the real acceptance gate2 of 4interfaces still open before vessel-level acceptanceDeskely tracks the interface test as its own record, not an average of the four OEM sign-offs.

    How it runs

    From steel and thrusters to a vessel proven on station.

    Support vessel programmes are dominated by late-arriving mission equipment, which is exactly what a linked dependency register is built to manage.

    1. 01

      Model hull and mission systems

      Cranes, moonpool, gangway, DP and ROV systems registered alongside standard hull and machinery.

    2. 02

      Parse equipment and interfaces

      General arrangements, mission layouts and vendor drawings drafted into a reviewed tag register.

    3. 03

      Link power management dependencies

      Cross-system interfaces recorded as prerequisites so integration issues surface before trials.

    4. 04

      Give vendors scoped access

      Each mission equipment vendor signs its own commissioning records while the yard sees one register.

    5. 05

      Run integration and DP trials

      Functional, integration and DP/FMEA trial results captured per system with punch categorised on the spot.

    6. 06

      Deliver with a full dossier

      Sea trial and delivery certificates issued from signed records, with a per-system pack handed to the owner.

    FAQ

    Questions about Offshore support vessels scopes.