Methanol/ammonia readiness, scrubbers, ballast water, shore power

    Commissioning software for retrofits where a working ship has to come out proven, not just modified.

    Dual-fuel conversions, methanol and ammonia readiness packages, scrubbers, ballast water treatment and shore power retrofits are executed against a fixed drydock window on a vessel that already has an operating history. Deskely holds new and existing systems in one register, so the retrofit is proven against the same rigour as a newbuild without inheriting undocumented history as an assumption.

    Scope
    Scrubber, BWTS, dual-fuel, shore power
    Constraint
    Fixed drydock window
    Interfaces
    Tie-ins to existing systems
    Gate
    Class survey and redelivery
    SCRUBBER ROOM — RETROFIT ZONE R-3RETROFIT SPEC SET · REV ADUAL-FUEL TANKGF-TNK-LNG1TO ENGINE ROOMExisting HFO line — decommissionedgas detection retrofit openMETHANOL / LNG DUAL-FUEL CONVERSION — SAFETY ZONE MARKEDTAG REGISTERECO-SCR-02Exhaust gas scrubber unitRecords signedECO-BWT-01Ballast water treatment u…In testECO-SHP-04Shore power connection boxPreservationECO-SCR-STKScrubber uptake ductingPunch open18 sheetsunder one system hierarchy

    The problem

    The window is fixed, and the vessel's existing systems are only partly documented.

    A scrubber, ballast water treatment system, dual-fuel conversion or shore power retrofit has to be installed, tied in and proven inside a drydock window measured in weeks, on a ship whose original build records are incomplete or held by a different yard.

    Tie-ins to existing piping, power distribution and control systems are where retrofit problems concentrate, and they are the hardest thing to plan for from a fixed-price scope document alone.

    Deskely registers the retrofit scope and its tie-in points as their own assets from day one of the window, so the interface between new and existing systems is tracked with the same rigour as the new equipment itself.

    A NEW FUEL, NO MARGIN FOR ERRORMethanol dual-fuel retrofitFuel system, scrubber, ballast water and shore power each need separate flag and class approvalMethanol fuel supply systemflag + class approvedScrubber exhaust gas cleaningflag + class approvedBallast water treatmentapproval outstandingShore power connectionapproval outstanding2 of 4systems without both flag and class sign-off before fuel changeover trialRunning the changeover trial without every approval risks a gas release incident, not a paperwork delay.Deskely blocks the fuel changeover trial until every system's dual sign-off is on file.

    Setting up the register

    New systems and tie-in points are registered before the window opens.

    Scrubber, ballast water treatment, fuel gas or methanol supply, and shore power systems are modelled as new subsystems, each with its own equipment list and record set.

    Tie-in points into existing piping, electrical distribution and control systems are registered as their own assets with short, targeted record sets, because that is where the technical and schedule risk sits.

    Templates are prepared ahead of the drydock, so the window opens with a register ready to receive evidence rather than one being built on the fly.

    1 · SOURCE DOCUMENTSRetrofit spec rev A3 systemsScrubber P&ID18 sheetsBallast water treatment …6 unitsShore power interface dr…4 sheetsPARSE + MATCHtag · description · drawing ref2 · ONE TAG REGISTERECO-SCR-02Exhaust gas scrubber unitSCRUBBER ROOMECO-BWT-01Ballast water treatment u…BALLASTECO-SHP-04Shore power connection boxELECTRICALECO-SCR-STKScrubber uptake ductingSCRUBBER ROOMTWO DOCUMENTS DISAGREERetrofit spec rev…Ballast water treatment unitScrubber P&IDAbbreviated descriptionEngineer picks the sourcedecision loggedWeeks of transcription become a draft an engineer reviews.

    Execution

    Installation, tie-in and commissioning captured against a fixed calendar.

    Technicians and equipment vendors sign installation, tie-in and functional test records on tablets in the drydock, working offline where connectivity in the dock is poor and syncing on reconnect.

    Punch is raised with photos and categorised by whether it blocks commissioning, sea trials or redelivery, so the yard can prioritise the items that threaten the window.

    Progress rolls up per system and per tie-in, which is what lets the yard make an evidence-based go or slip decision on the window rather than a schedule-driven one.

    FUEL CHANGEOVER APPROVAL LADDERMethanol retrofitEngineering approval, flag and classDesign approved both partiesSystem installationFuel supply and scrubber installedGas/fuel system commissioningLeak and purge tests runningClass surveyAwaiting commissioning sign-offFuel changeover sea trialAwaiting class surveyRedeliveryAwaiting changeover trial certificateThe changeover trial does not run until every system on the ladder has both flag and class sign-off.

    Class survey and redelivery

    Retrofit acceptance depends on a chain of new equipment and tie-in evidence.

    Class survey of the new systems and their tie-ins depends on installation, functional test and — where applicable — sea trial results, each enforced as a prerequisite from records held in the register.

    The dossier per retrofit system gives the owner and class the drawings, settings and test results needed to close notation and endorsement changes.

    Work that does not fit the window is carried as punch with an owner and a date and stays live after redelivery, instead of disappearing into a closeout note the next yard will never see.

    System ECO-SCR-02 — retrofit acceptance ladderClass and flag state both sign before the retrofit counts toward complianceICInstallation completeIssued 03 SepPiping and ducting records212 / 212 signedStructural reinforcement verifiedcompleteSCSystem commissioningReady — awaiting supplierWash water discharge testcompleteEmission monitoring calibrationcompleteSTVSea trial verificationBlocked — 6 itemsBlocking punch6 openClass EGCS certificatenot issued

    Gas-freeing and hot work on a live fuel system

    Converting fuel tanks and piping means gas-freeing and hot-work permits sit on the critical path, not the equipment itself.

    Converting existing fuel oil tanks and piping for methanol, ammonia or LNG as fuel, or tying a scrubber's exhaust duct into an existing uptake, requires the space to be gas-freed, tested and permitted for hot work before a single weld can be made, and that sequence is often the true constraint on the drydock window rather than the mechanical installation itself.

    A missed gas test, an expired hot work permit, or a tank re-entry that was not re-tested after a shift change is exactly the kind of gap that halts work mid-window while the yard rechecks a space that was supposedly cleared days earlier.

    Deskely records gas testing, hot work permits and re-entry checks against the specific tank or compartment, with expiry enforced so a permit that has lapsed blocks further work on that space until it is retested, rather than relying on a permit board on the quay.

    DUAL-FUEL CHANGEOVER SAFETY CASEFlag and class sign-offEvery system on the new fuel path needs both flag and class approval before changeoverSAFETY CASE EVIDENCEGas detection and ventilation system testEmergency shutdown sequence provenBunkering procedure trial witnessedCrew training and familiarisation recordsDUAL SIGN-OFF, EVERY SYSTEMFlag state approval alone does not authorise the changeover trialClass approval alone does not authorise it either2 of 4items still missing one of the two required approvalsThe changeover trial runs only once every item on the safety case carries both signatures.

    How it runs

    From a scoped retrofit to a vessel back on charter.

    Retrofit windows are unforgiving of documentation gaps, which is why templates prepared before the vessel arrives matter more here than almost anywhere else.

    1. 01

      Register new systems and tie-ins

      Scrubber, BWTS, fuel system or shore power scope and its tie-in points modelled as assets ahead of the window.

    2. 02

      Template the record set

      Installation, tie-in and functional records prepared in advance of drydocking.

    3. 03

      Parse retrofit drawings

      Vendor drawings and interface schedules drafted into a reviewed register before work starts.

    4. 04

      Give vendors scoped access

      Equipment vendors and yard trades sign their own records while the yard sees one readiness view.

    5. 05

      Execute inside the window

      Installation, tie-in, functional test and punch capture on tablet, offline where the dock has no signal.

    6. 06

      Close out for class and redelivery

      Survey and redelivery certificates issued from signed records, with carried punch owned and dated.

    FAQ

    Questions about Green retrofits scopes.

    Ready to digitize
    commissioning and
    handover?

    We use cookies to improve your experience.
    You can opt out of certain cookies.
    Find out more in our privacy policy.