Cranes, docks, utilities, quayside

    Commissioning software for yard infrastructure where the facility has to be proven before it can build ships.

    Goliath and gantry cranes, graving docks and floating docks, quayside utilities, dock pumping systems and yard power distribution are commissioned as capital infrastructure in their own right, usually on a schedule set by the first hull that needs to use them. Deskely tracks facility systems and dock infrastructure in one register with acceptance gated per system, so the yard opens on evidence rather than a target date.

    Assets
    Cranes, docks, utilities, quayside
    Testing
    Load tests and dock trials
    Driver
    First hull dependency
    Gate
    Facility acceptance
    GRAVING DOCK 3 — CAISSON AND PUMPING STATIONFACILITY ASSET REGISTER · REV GGANTRY CRANE 1200TYD-GNT-01VESSEL ON KEEL BLOCKSDOCK UTILITIES — POWER, AIR, WATER, CRANE RAILSYARD FACILITY — GRAVING DOCK NO. 2TAG REGISTERGD3-PMP-01Dock 3 dewatering pumpRecords signedGD3-CAI-VLVCaisson sealing valveIn testCR-RAIL-04Goliath crane rail sectionPreservationUTL-COMP-03Compressed air main, dock…Punch open22 sheetsunder one system hierarchy

    The problem

    The facility is treated as background until a hull is waiting on it.

    Goliath cranes, graving or floating docks, dock pumping systems, quayside power and utilities and yard workshops are commissioned by a mix of specialist contractors and yard trades, often under less scrutiny than the ships that will use them.

    When a hull is ready to move onto a dock or under a crane that has not itself been proven, the facility becomes the schedule constraint the whole programme was built to avoid.

    Deskely holds facility systems in the same register discipline used for a vessel, so dock and crane readiness is evidence-based before the first hull depends on it.

    SHARED INFRASTRUCTURE, COMPETING PROJECTSYard-wide facilitiesThe crane, the dock and the utility grid are not owned by any single vessel project300 t gantry crane3 vessel projects this weekDrydock 2 caisson and pumpsLast load test 14 months agoCompressed air and shore power gridNo single owner of the maintenance log14 monthssince the caisson that everyone depends on was last testedA facility failure blocks every vessel project on the quay, not just one job.Deskely tracks facility assets on their own maintenance cycle, independent of any single vessel.

    Setting up the register

    Cranes, docks and utilities are subsystems with their own completion paths.

    Cranes and lifting equipment, dock structures and pumping systems, quayside power and utilities, compressed air and workshop services each hold their own equipment lists and record sets.

    Facility drawings, single line diagrams and equipment schedules are parsed into a reviewed register, so every crane, pump and distribution board carries its drawing reference.

    That structure is what lets the yard commission a dock or a crane independently of the hull programme, while still linking the two where a hull genuinely depends on a specific facility asset.

    1 · SOURCE DOCUMENTSFacility asset register …3 dry docksCaisson and pumping stat…22 sheetsCrane rail inspection sc…6 cranesUtility mains as-builts48 branchesPARSE + MATCHtag · description · drawing ref2 · ONE TAG REGISTERGD3-PMP-01Dock 3 dewatering pumpPUMPING STATIONGD3-CAI-VLVCaisson sealing valveCAISSONCR-RAIL-04Goliath crane rail sectionCRANE INFRASTRUCTUREUTL-COMP-03Compressed air main, dock…UTILITIESTWO DOCUMENTS DISAGREEFacility asset re…Caisson sealing valveCaisson and pumpi…Abbreviated descriptionEngineer picks the sourcedecision loggedWeeks of transcription become a draft an engineer reviews.

    Execution

    Installation, load testing and dock trials captured against the facility asset, not a project file.

    Contractors and yard engineers sign installation, functional test, load test and dock trial records on tablets at the equipment, including statutory lifting equipment certification.

    Punch is raised with photos and categorised by whether it blocks facility acceptance or the first hull dependent on it.

    Progress rolls up per facility system, which is the level yard management actually needs to plan the next docking or lift around.

    FACILITY COMMISSIONING LADDERYard infrastructureCivil works and structural sign-offDock walls and quay completeUtility installation — power, air, waterAll services connectedCrane commissioning and load test300 t gantry, static test passedDock caisson and pump testAwaiting crane close-outFacility acceptanceAwaiting caisson testOperational handoverAwaiting facility acceptanceFacility acceptance runs on its own ladder, independent of any vessel project using the yard.

    Facility acceptance

    A crane or a dock is accepted on the same evidence chain as a ship system.

    Facility acceptance depends on installation, functional test and statutory load test or dock trial results, each enforced as a prerequisite from the records beneath.

    The dossier per facility asset gives yard operations and the classification or regulatory body responsible for lifting equipment and dock structures what they need for ongoing statutory compliance.

    The asset history then supports periodic re-testing and inspection long after the original commissioning project has closed.

    System GD3-PMP — facility certification ladderPort authority sign-off gates the dock's return to serviceAIAsset inspectionIssued 14 JanStructural surveycompletePump overhaul records6 / 6 signedSTStatutory testReady — booked with port authorityCaisson leak testcompletePumping capacity testcompleteDCDock certificationBlocked — 4 itemsBlocking punch4 openPort authority inspectionnot scheduled

    The re-certification clock never stops

    A crane or a dock commissioned once then needs proof-load testing and inspection on a statutory cycle for the rest of its service life.

    Unlike a ship that is delivered and moves on, yard infrastructure stays in service for decades, and cranes, lifting gear, dock caissons and pressure systems each carry statutory re-inspection and proof-load testing intervals that keep running long after the original commissioning project has been closed out and its team reassigned.

    When that history is filed away at project closeout, the next due date is tracked on a maintenance planner's own list, disconnected from the original test certificates, and a lapsed statutory inspection on a Goliath crane can stop a hull lift with no warning.

    Deskely keeps the original commissioning record live as an asset history rather than an archived project, with statutory re-test due dates surfaced against the same crane or dock tag years later, so the next proof load test is scheduled against a certificate trail instead of institutional memory.

    CRANE AND CAISSON CERTIFICATIONFacility assets, not a vesselLoad tests and pressure tests recertified on their own cycle, shared across every projectFACILITY CERTIFICATION RECORD300 t gantry crane, annual load testDrydock 2 caisson pressure testDock pump capacity testQuayside bollard pull testWHY THIS MATTERS TO EVERY PROJECT AT ONCEAn expired caisson certificate blocks undocking for every vessel in the yardFacility certification runs on its own calendar, independent of any one job14 mosince the caisson certificate was last renewedFacility assets carry their own certification clock, visible to every vessel project relying on them.

    How it runs

    From foundations and steel to a yard ready to build.

    Facility infrastructure is capital equipment with a long service life, and it deserves the same discipline as the ships it will eventually build.

    1. 01

      Model facility subsystems

      Cranes, dock structures, pumping systems, utilities and workshop services registered as assets.

    2. 02

      Parse facility drawings

      Single line diagrams and equipment schedules drafted into a reviewed tag register.

    3. 03

      Link hull dependencies

      Where a hull genuinely depends on a facility asset, that dependency is recorded explicitly.

    4. 04

      Give contractors scoped access

      Crane, dock and utility contractors sign their own records while the yard sees one register.

    5. 05

      Run load tests and dock trials

      Statutory load testing, functional testing and dock trials recorded per asset with punch categorised.

    6. 06

      Accept and hand to operations

      Facility acceptance issued from signed records, with a dossier supporting statutory re-inspection.

    FAQ

    Questions about Yard facilities and drydocks scopes.

    Ready to digitize
    commissioning and
    handover?