Piping inspection checklist: free installation checklist (Excel and PDF)

Deskely Completions team Singapore

Before a line goes into a test pack, it is walked and checked against its isometric: materials, welds, routing, supports, flanged joints, valves, vents and drains. The piping inspection checklist makes sure the same checks are made on every line.

This page gives you a free piping installation inspection checklist in Excel and PDF, one line per sheet, and explains what each group of checks is for.

Key takeaways
  • Inspect each line against its latest isometric before it goes into a test pack.
  • Supports and flanged joints cause most findings; check them closely.
  • Spring supports keep their travel stops in until after the pressure test.
  • Everything not right becomes a punch item before testing.

What the checklist covers

GroupTypical checks
Materials and weldingComponents to the piping class, weld log up to date, NDT and PWHT done, spec breaks in place.
Routing and supportsRouting and elevations, supports and guides in contact, shoes free to slide, spring supports set, slopes.
Flanged jointsAlignment and parallelism, gasket type, bolting and thread engagement, tightening record.
Valves and in-line itemsFlow direction, access to handwheels, instruments installed or removed for the test, vents, drains, small-bore bracing.
Before the test packClearances, internal cleanliness, temporary items, redlines on the isometric.

The template

Piping installation inspection checklist template with line number, isometric and test pack fields, progress counts and 22 checks grouped by materials and welding, routing and supports, flanged joints, valves and before the test pack
The free piping inspection checklist: one line on one page.

Mark each check Accepted, Rejected or N/A; the counts update at the top. Rejected checks become punch items on the punch list before the line can be tested.

From checklist to test pack

The checklist is one of the inputs to the hydrostatic test report: a test pack should not be released while the lines in it still have open findings. See flange types and the weld map for the detail behind two of the groups.

Deskely Testpack builds the packs from the line list and the drawings and shows what still blocks each one, from open welds to punch items.

The Deskely products for this

Frequently asked questions

What is a piping inspection checklist?

A list of checks made on an installed line against its isometric and specification: materials, welds, routing, supports, flanged joints, valves, vents and drains.

When is piping inspected?

After installation and before the line goes into its test pack, then again after the test for reinstatement.

Who inspects the piping?

The contractor's piping QC inspector, often with the client for a joint walkdown.

Is the template free?

Yes. Download the Excel or PDF version and adapt it to your piping specification.

Test packs released with open findings?Deskely Testpack builds the packs from the line list and the drawings and shows what still blocks each one, from open welds to punch items.
  • In production since 2014
  • Thousands of daily users
  • On MODEC FPSO projects since 2016

Autonomous engineering runs on Deskely.

Talk to sales