P&IDResources / Symbols / P&ID symbols / Line typesUpdated 29 Oct 2026

Process line symbol

Also called Major process line, Main process piping

A process line is a pipe carrying the main process fluid between equipment.

Process line P&ID symbol
Process line symbol, as drawn on a P&ID

What the process line symbol means

A process line is a pipe carrying the main process fluid between equipment.

How it is drawn

A thick solid line with flow arrows, labelled with a line number giving size, service, number and piping specification.

The process line symbol in each standard

US legend (PIP PIC001)

Drawn as on most US-style legend sheets.

ISO 10628-2405

Pipeline. A solid line, as in every standard.

German (DIN): Hauptrohrleitung. See DIN P&ID symbols.

Where you see it on a P&ID

For all main process piping on the P&ID.

Tag codes

The process line is commonly tagged:

  • Line number, e.g. 6"-P-1001-A1A

Tag formats follow the project numbering procedure. For instruments, the letters follow ISA 5.1, explained on the instrument symbols page.

Frequently asked questions

What does the process line symbol look like on a P&ID?

A thick solid line with flow arrows, labelled with a line number giving size, service, number and piping specification.

What is a process line used for?

A process line is a pipe carrying the main process fluid between equipment. You will find it for all main process piping on the P&ID.

What tag does a process line have?

It is commonly tagged Line number, e.g. 6"-P-1001-A1A. The exact tag format comes from the project numbering procedure and the legend sheets.

Is the process line symbol the same in ISA and ISO?

Yes, ISO 10628-2 draws it the same way (405). Companies vary the details, so always check the legend sheets at the front of the P&ID set.

What is the process line called in German?

Hauptrohrleitung. On a German R&I-Fließschema it is drawn to DIN EN ISO 10628-2.

Every process line on your drawings, found for you.Deskely Extract reads ISA and ISO P&IDs alike, finds each tag with its type, system and subsystem, and hands your engineers a register to check instead of a spreadsheet to type.
  • In production since 2014
  • Thousands of daily users
  • On MODEC FPSO projects since 2016

Autonomous engineering runs on Deskely.

Talk to sales